Submersible Vortex Vertical Sewage Pump Low Pressure IP68 Motor Protection
Negotiable /Piece
Min.Order:1 Piece
TECO Motor Low Pressure Non Clog Sewage Pump , Single Stage Submersible Vortex Pump
Portable Non Clog Sewage Pump , Submersible Single Stage Centrifugal Pump rpm 2900
Semi Open Impeller Non Clog Sewage Pump High Head Capacity 60 m/h
Low Noise Submersible Jet Aerators , Large Pond Water Aeration Systems
Unique Noise Free Jet Aerator Replacement High Efficiency Oxygen Dissolving
High Air Dissolving Rate Submersible Jet Aerators , Wastewater Water Pump Aerator
Submersible Vortex Vertical Sewage Pump Low Pressure IP68 Motor Protection
Application range:
1 | Farm irrigation . |
2 | Pasturage drainage. |
3 | Civil and architectural engineering construction. |
Features:
1 | Excellent semi-open impeller. |
2 | The impeller will generate vortex flow. |
3 | Induction motor are F class insulation |
4 | motor protection grand is IP68. |
DP structure & material:
Number | Name | Material | ||
GB | JIS | |||
1 | Handle | Q235 | SS40 | |
2 | Motor cover | HT200 | FC200 | |
3 | O-ring | NBR | NBR | |
4 | Bearing | - | - | |
5 | Rotor | - | - | |
6 | Shaft | 3Cr13 | SUS420J2 | |
7 | Bearing | - | - | |
8 | Bracket | HT200 | FC200 | |
9 | Mechanical seal | SiC-SiC | SiC-SiC | |
10 | Impeller | HT200 | FC200 | |
11 | Pump casing | HT200 | FC200 | |
12 | Oil cover | HT200 | FC200 | |
13 | O-ring | NBR | NBR | |
14 | Stator | - | - | |
15 | Motor casing | HT200 | FC200 | |
16 | Cable | - | - |
Type description:
DP51.5-50
DP: Submersible sewage pump
5: Frequency 5: 50Hz
1.5: Rated power(kW)
50: Outlet diameter (mm)
Installation guide tube:
If the depth of the sewage tank is less than 6 meters, two guide tubes with appropriate lengths shall be sawed in accordance with the distances between the tank depth and the base as well as the distance between the two tapers of the fixed support, and then these two ducts shall be put into the taper and kept vertically. If the tank depth is over 6 meters, couplings shall be applied for the connection of long guide tube and short one, and be fastened with locking set screw.
Adjustment of fixed frame:
Adjust the fixed frame, detachable body and check the verticality of ducts, keeping their centers at the same horizontal plane; and then fasten all the screws of the system to make sure that the system can not make any move at the vertical and horizontal position.
Install drainage pipeline:
Connect the drainage pipe, bends, wall pipes, swing check valves and wedge gate valves etc properly, fill the void between the wall pipes and the tank wall fully with concrete.
Install water pump:
Install the chain into the ring hole of the water pump with the shackle and lift the water pump, then slip the slide into the sewage tank through the duct and stuck on the inlet flange of the detachable body. The correct working position can be automatically acquired with the dead weight of the water pump, and the sealing property of the outlet of the water pump and the water inlet of the base.
Factory situation: