Submersible Vortex Vertical Sewage Pump Low Pressure IP68 Motor Protection

Submersible Vortex Vertical Sewage Pump Low Pressure IP68 Motor Protection

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
GSD
Place of Origin:
China
Model Number:
DP

GSD Industrial Co., Ltd.

Business Type: Trading Company
Main Products: Sewage Treatment Equipment ,Submersible Sewage Pump ,Self Priming Sewage Pump

Product Details

Delivery Time:15 days
Certification:CE,ISO,SPAN,ECA

Submersible Vortex Vertical Sewage Pump Low Pressure IP68 Motor Protection​

Application range:

1 Farm irrigation .
2 Pasturage drainage.
3 Civil and architectural engineering construction.

Features:

1 Excellent semi-open impeller.
2 The impeller will generate vortex flow.
3 Induction motor are F class insulation
4 motor protection grand is IP68.

DP structure & material:

Number Name Material
GB JIS
1 Handle Q235 SS40
2 Motor cover HT200 FC200
3 O-ring NBR NBR
4 Bearing - -
5 Rotor - -
6 Shaft 3Cr13 SUS420J2
7 Bearing - -
8 Bracket HT200 FC200
9 Mechanical seal SiC-SiC SiC-SiC
10 Impeller HT200 FC200
11 Pump casing HT200 FC200
12 Oil cover HT200 FC200
13 O-ring NBR NBR
14 Stator - -
15 Motor casing HT200 FC200
16 Cable - -

Type description:

DP51.5-50

DP: Submersible sewage pump

5: Frequency 5: 50Hz

1.5: Rated power(kW)

50: Outlet diameter (mm)

Installation guide tube:

If the depth of the sewage tank is less than 6 meters, two guide tubes with appropriate lengths shall be sawed in accordance with the distances between the tank depth and the base as well as the distance between the two tapers of the fixed support, and then these two ducts shall be put into the taper and kept vertically. If the tank depth is over 6 meters, couplings shall be applied for the connection of long guide tube and short one, and be fastened with locking set screw.

Adjustment of fixed frame:

Adjust the fixed frame, detachable body and check the verticality of ducts, keeping their centers at the same horizontal plane; and then fasten all the screws of the system to make sure that the system can not make any move at the vertical and horizontal position.

Install drainage pipeline:

Connect the drainage pipe, bends, wall pipes, swing check valves and wedge gate valves etc properly, fill the void between the wall pipes and the tank wall fully with concrete.

Install water pump:

Install the chain into the ring hole of the water pump with the shackle and lift the water pump, then slip the slide into the sewage tank through the duct and stuck on the inlet flange of the detachable body. The correct working position can be automatically acquired with the dead weight of the water pump, and the sealing property of the outlet of the water pump and the water inlet of the base.

Factory situation: 

Contact Supplier

Ms. Emma Huang sale Manager Chat Now
Telephone
86-21-50550317
Mobile
86-15000942273
Fax
86-21-58549706
Skype
emmahuang8602
Address
No.796, Yun Qiao Road Quzhou,Zhejiang

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Packaging & Printing > Plastic Film
Categories
Hi~