Submersible Jet Pump Aerator Stable Intensive Mixing Easy Installation

Submersible Jet Pump Aerator Stable Intensive Mixing Easy Installation

Negotiable /Ton

Min.Order:1 Ton

Supply Ability:
0 Ton / Tons per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
GSD
Place of Origin:
China
Model Number:
AR

GSD Industrial Co., Ltd.

Business Type: Trading Company
Main Products: Sewage Treatment Equipment ,Submersible Sewage Pump ,Self Priming Sewage Pump

Product Details

Delivery Time:15 days
Certification:CE,ISO,SPAN,ECA

Submersible Jet Pump Aerator Stable Intensive Mixing Easy Installation​

AR Installation base:

1. The base shall be of enough strength, stability and durability.

2. The subsidence and the inclination shall be within the allowable range under the static strength to ensure the normal operation of the water aerator.

3. The clear distance between the detachable flange to the side face of the base is not less than 100mmm generally. The thickness of the leveling blanket or the grout blanket of second placement is not less than 25mm.

4. The form, sizes and installation position of the ground bolt shall be adopted in accordance with the installation drawing. Its minimal depth buried in the concrete shall be determined with the actual stress; when it is impossible to determine its stress, the minimum depth can be determined by considering the principle that the bolt is pulled broken rather than pulled out.

5. The weight of the designed base and the embedded depth of the base shall be determined in accordance with the requirements of the installed objects, with the principle that the disturbing force will not shake the base when the aerator is in operation. The weight of the water aerator generally shall be over 10 times that of the water aerator.

6. The height of the base shall satisfy the structure requirements, i.e. ensure there is concrete protection with sufficient thickness under the bottom of the bolt embedded parts, which shall be thinner as far as possible with a certain thickness (strength guarantee) of the pit bottom.

7. The base shall be arranged with reinforcement steels to prevent fissures caused by temperature and shrink stress, uneven settlement or vibration. The diameter of the reinforcement steels shall be 10 to 16mm and the space 200 to 400mm.

AR Installation:

1. Mount the track on the foundation.

2. Put the guiding rod on the track and fix the upper part of the guide rod which shall be vertical to the ground at best.

3. Install the inlet pipe on the air inlet of the aerator.

4. Hoist the aerator and put it into water slowly along the guide rod, fasten the cable along the inlet pipe and fix the upper part of the inlet pipe at the same time with a view to prevent the machine body from being damaged.

5. After the completion of the installation, the machine may be powered on for trial operation.

AR Structure:

No. Name Material
GB JIS
1 Cable 2RNCT 2RNCT
2 The motor cover HT200 FC200
3 Ball bearing - -
4 O-ring NBR NBR
5 Motor casing HT200 FC200
6 Main shaft 2Cr13 SUS420J1
7 Bracket HT200 FC200
8 Mechanical seal C-Al2O3 C-Al2O3
9 Lubricant ISO VG32 ISO VG32
10 Mechanical seal SiC-SiC SiC-SiC
11 Oil cover HT200 FC200
12 Aeration housing HT200 FC200
13 Bottom cover of aeration housing HT200 FC200
14 Entrance panel board NBR NBR
15 Screw A2-70 A2-70
16 Gasket 3Cr13 SUS420J2
17 Impeller ZG0Cr18Ni9 SUS304
18 Ball bearing - -
19 Stator - -
20 Rotor - -
21 Terminal box HT200 FC200
22 Lifting rings 0Cr18Ni9 SUS304

AR Performance:
 

Type Power Operation range
(m)
Min-max
water depth
(m)
Air inlet pipe
diameter
(mm)
The maxium
intake of air

Contact Supplier

Ms. Emma Huang sale Manager Chat Now
Telephone
86-21-50550317
Mobile
86-15000942273
Fax
86-21-58549706
Skype
emmahuang8602
Address
No.796, Yun Qiao Road Quzhou,Zhejiang

New Products

Find Similar Products By Category