5SHX2645L0004 control unit
Negotiable /Bag
Min.Order:1 Bag
Before Honeywell launched the TDC2000 system in 1975, process industrial control was still in the era of process instrument automation control. Electric instruments were used abroad, while pneumatic instruments were mainly used domestically, and electric instruments were just beginning to be tried. The production process has relatively low requirements for automation control, mainly to ensure stable and relatively safe production operation. It is impossible or difficult to achieve complex control, let alone advanced or optimized control, resulting in relatively low production efficiency, high energy consumption, and high product costs. Although various models of computers had already emerged and many people attempted to use them for process control, the production losses and safety hazards caused by computer failures were not effectively addressed, making it impossible to truly implement the use of computers for production process control.
The launch of TDC2000 is of great significance in proposing and implementing the concept of distributed control. Centralized operation and management to achieve more coordinated operation between various circuits or equipment, in order to improve the stability and safety of production and operation; Decentralized control, achieving hazard dispersion and isolation, and easy installation and maintenance.
Over 30 years of practice have proven that the concept of distributed control is a fundamental principle of computer process control. This concept is not only not outdated today, but will also be a dominant route in computer process industrial control for a considerable period of time in the future.
Contact information: 15359293870
WhatsApp:+86 15359293870
Contact person: KELLY
Email: geabbdcs@gmail.com 386353502@qq.com
Official website:
3. GUS operation station host upgrade: TPS was launched in 1998, and it has been 12 years since then. Based on the level of computer development at that time, the configuration was very backward, and the basic use was Dell's GX1 series computer, which used the NT operating system. Therefore, these computers are now entering a period of high incidence of malfunctions, posing a serious threat to safety production. They can no longer meet the current needs of users in production, especially for data collection, and often encounter unfavorable factors such as malfunctions or damage, small memory, small hard drives, and slow processing speed. If you look for the original manufacturer, the upgrade cost is too high, and most users cannot accept it. Haitian Weiye Automation Company has very successful experience in this area, and can use the latest configuration of computers to upgrade the original operating station without upgrading the original software to meet user needs.
4. Server upgrade: For the early plantscape/pks system, the DCS communication architecture adopts server and client architectures. The system monitoring operation station adopts ordinary PC workstations, and the server usually adopts the DELL PowerEdge series. As the system lifespan increases, ordinary commercial PC hardware is facing updates and upgrades. Haitian Weiye Automation Company focuses on the Windows NT operating system limitations, PCI slot limitations ISA slot restrictions and other issues can provide a series of solutions to help users solve system server upgrade challenges at the lowest cost.
5. Upgrading CRT displays to LCD displays: The TDC3000/TPS system mostly uses Z-type operating stations with built-in CRT displays. As these types of displays have been discontinued, it is a challenging problem when users have a demand. Haitian Weiye Automation Company has developed two types of LCD displays, 19 inch and 21 inch, to meet users' needs