Industry Automatic Peanut Butter Processing Equipment Peanut Butter Processing Plant
Negotiable /Set
Min.Order:1 Set
Henan Gelgoog Machinery CO,LTD
Electric Sesame Paste Grinding Machine Groundnut Paste Production Line
Stainless Steel Peanut Butter Processing Machine Sesame Tahini Paste Production Line
Electric Almond Paste Making Machine Almond Paste Grinding Production Line
Commercial Industrial Automatic Almond Grinder Peanut Butter Making Machine
Industrial Cashew Nuts Butter Machine Nuts Butter Grinding Machine
Plant equipment production line cashew butter processing machine
Process flow and equipment of peanut butter production line
The process flow of the peanut butter production line: raw material improvement-stone and impurity removal-baking-cooling-peeling-selection-coarse grinding-fine grinding-blending-cooling-degassing-filling.
No. | Name | Power(kw) | Size(mm) | Qty |
1 | Roaster | 47.2 | 2900*2100*1700 | 1 |
2 | Convey Belt | 0.75 | 3600*700*1500 | 1 |
3 | Cooling Belt | 6 | 6000*1200*1600 | 1 |
4 | Peeling Machine | 0.74 | 1100*450*1100 | 1 |
5 | Picking Belt | 0.75 | 6000*800*1000 | 1 |
6 | Elevator | 0.75 | 1000*500*4200 | 1 |
7 | Storage Tank | 1200*1200*3800 | 1 | |
8 | Peanut Butter Grinder | 11*3 | 1250*550*1100 | 1 |
9 | Chiller | 3P | 1200*600*1200 | 1 |
10 | Storing Tank | 1000*1000*900 | 1 | |
11 | Mixing Tank | 2.2 | 300L | 1 |
12 | Vacuum Degassing Tank | 2.2+1.5 | 300L | 1 |
13 | Paste Cooling Machine | 0.75 | 2000*400*1700 | 1 |
14 | Filling Machine | |||
15 | Workbench | 1200*1200*800 | 1 | |
16 | Paste Pump | 1.5*3 | 1200*300*350 | 3 |
Workshop requirements:
No less than 120 square meters (the direction of each single machine can be set according to the specific size of the workshop)
The total power is about 65KW, and the other consumption is mainly that the circulating water in the interlayer can be used for recycling by digging a well or equipped with a chiller)
It takes about 5-8 people to operate.
The peanut butter production line can be equipped with reasonable equipment according to the customer's process requirements. In addition, according to the customer's capital budget, there are high, medium and low grade equipment and materials to choose from.