Aluminium Formwork System (factory ISO9001:2008)
USD $202 - $205 /Square Meter
Min.Order:500 Square Meters
Hebei Jinbiao Construction Materials Tech Corp., Ltd.
1. Aluminum Formwork System
Material | 6061-T6 Aluminum alloy |
Main Components | Beam, column, wall, prop, others |
Applications | Residential building |
Exhibition setup | |
All the towers can be connected together for multi-purpose | |
Safe working load | ≥60KN/m2 |
Size | Non-standard: custom-made as per buy's requirements |
Features | Easy to Handle |
One-time Pouring | |
High Concrete Pouring Rate | |
More Reuses | |
Great Recyclable Value | |
Environmental Friendly |
Aluminum Formwork System Advantage
1. Construction cycle is short, high efficiency: Aluminum formwork system for the fast form removal system,
generally 18~36 hours to form removal, so only one layer of aluminum templates plus three single support can
be used, a layer of the normal construction of up to 3~4 days, thus greatly shorten the construction period, the
construction units to save administrative costs, as well as real estate developers to shorten the development cycle.
2. Reusable Low cost: Regulate the construction of a template can be flipped 300 times or more, use of
low cost
3. Easy construction, high efficiency: Aluminum formwork system assembly is simple, convenient installation,
simply pro rata increase the standard board, light weight aluminum template per square meter 18~25KG.
Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment
4. Good stability, high capacity: capacity up to 60KN per square meter.
5. Wide range of applications: Aluminum formwork system is suitable for all building components, such as
load~bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once.
Aluminum Formwork System VS Timber Formwork
NO. | Reference | Aluminum Formwork System | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality.
2. Aluminum Formwork System contains all supporting, waling,release agent etc which must be
used under construction.
3. Aluminum Formwork System General Specification
Aluminum Formwork System | |
Material | Aluminum alloy 6061-T6 |
Panel thickness | 4mm |
Rocker | 50mm |
Wall panel | 600(W) X 2300/2450(H) |
Deck panel | 600(W) X 1200(H) |
Deck beam | 150(W) X 900/1050 (H) |
Formwork weight | 18-22kg/m2 |
Carrying capacity | 60kn/m2 |
We can also manufacture upon your requested design with different sizes.
Aluminum Formowork System Panel
Aluminum Formowork System Panel and Supports
Aluminum Formowork System Workshop
Construction Site
Certification
Welcome to visit us-Jinbiao Group