High-efficiency Aluminum Alloy Formwork System
USD $203 - $206 /Square Meter
Min.Order:500 Square Meters
Hebei Jinbiao Construction Materials Tech Corp., Ltd.
ALUMINIUM ALLOY FORMWORK SYSTEM / ALUMINUM CONCRETE FORMS
1. Aluminum Alloy Formwork System
Material | 6061-T6 Aluminum alloy |
Main Components | Beam |
column | |
wall | |
Prop | |
Others | |
Applications | Residential building |
Exhibition setup | |
All the towers can be connected together for multi-purpose | |
Safe working load | ≥60KN/m2 |
Size | Non-standard: custom-made as per buy's requirements |
Features | Easy to Handle |
One-time Pouring | |
High Concrete Pouring Rate | |
More Reuses | |
Great Recyclable Value | |
Environmental Friendly |
Aluminum Alloy Formwork Advantage
1. Construction cycle is short, high efficiency : Aluminum formwork system for the fast form removal system, generally 18~36 hours to form removal, so only one layer of aluminum templates plus three single support can be used, a layer of the normal construction of up to 3~4 days, thus greatly shorten the construction period, the construction units to save administrative costs, as well as real estate developers to shorten the development cycle .
2. Reusable Low cost : Regulate the construction of a template can be flipped 300 times or more, use of
low cost
3. Easy construction, high efficiency : Aluminum formwork system assembly is simple, convenient installation, simply pro rata increase the standard board, light weight aluminum template per square meter 18~25KG. Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment
4. Good stability, high capacity: capacity up to 60KN per square meter.
5. Wide range of applications : Aluminum formwork system is suitable for all building components, such as load~bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once .
Aluminum Alloy Formwork VS Timber Formwork
NO. | Reference | Aluminum Alloy Formwork | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality .
2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction