Formwork For Concrete (ISO9001:2008)
USD $203 - $206 /Square Meter
Min.Order:500 Square Meters
Hebei Jinbiao Construction Materials Tech Corp., Ltd.
Material | 6061-T6 Aluminum alloy |
Main Components | Beam, column, wall, prop, others |
Applications | Residential building |
Exhibition setup | |
All the towers can be connected together for multi-purpose | |
Safe working load | ≥60KN/m2 |
Size | Non-standard: custom-made as per buy's requirements |
Features | Easy to Handle |
One-time Pouring | |
High Concrete Pouring Rate | |
More Reuses | |
Great Recyclable Value | |
Environmental Friendly |
Aluminum Formwork For Concrete Advantage
1. Construction cycle is short, high efficiency
2. Reusable Low cost
3. Easy construction, high efficiency
4. Good stability, high capacity
5. Wide range of applications
Aluminum Formwork VS Timber Formwork
NO. | Reference | Aluminum Formwork | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality .
2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be
used under construction
Complete concrete structure
Aluminum formwork panel
Accessories
Our work shop