Aluminum Formwork System
USD $203 - $206 /Square Meter
Min.Order:500 Square Meters
Hebei Jinbiao Construction Materials Tech Corp., Ltd.
1. Aluminum Formwork System
Material | 6061-T6 Aluminum alloy |
Main Components | Beam |
column | |
wall | |
Prop | |
Others | |
Applications | Residential building |
Exhibition setup | |
All the towers can be connected together for multi-purpose | |
Safe working load | ≥60KN/m2 |
Size | Non-standard: custom-made as per buy's requirements |
Features | Easy to Handle |
One-time Pouring | |
High Concrete Pouring Rate | |
More Reuses | |
Great Recyclable Value | |
Environmental Friendly |
Aluminum Alloy Formwork Advantage
1). Construction cycle is short, high efficiency: Aluminum concrete formwork for the fast
form removal system, generally 18~36 hours to form removal, so only one layer of aluminum concrete formwork plus three single support can be used, a layer of the normal
construction of up to 3~4 days, thus greatly shorten the construction period, the
construction units to save administrative costs, as well as real estate developers to shorten
the development cycle.
2). Reusable and low cost: Regulate aluminum formwork can be flipped repeated used 500 times or more, use of low cost
3). Easy construction, high efficiency: Aluminum concrete formwork assembly is simple,
convenient installation, simply pro rata increase the standard board, light weight aluminum
formwork per square meter 22~25KG. Construction process is completely assembled by
hand, transshipment; does not depend lifting equipment
4). Good stability, high capacity: capacity up to 60KN per square meter.
5). Wide range of applications: Aluminum concrete formwork system is suitable for all
building components, such as load~bearing walls, columns, beams, stairs, balconies, etc. are available through the cement pouring at once.
6). After form removal concrete surface effect: aluminum template after form removal, concrete flat and smooth surface quality can meet the requirements of concrete finishes and water, without the need for plastering, plastering cost savings secondary.
7). The scene does not produce construction waste, safer construction: aluminum template all the accessories can be reused after form removal site without any garbage, no rust, no fire hazards, the installation site without a nail, no chainsaw wood scraps wooden pins and other construction debris, construction site clean, not as a large amount of construction waste like wood template to use, fully meet green building construction standards.
8). Design a shape, high precision, practicality: according to the construction design drawings, forming a whole pouring, construction errors tight little high accuracy, and ensure the overall strength and service life of the building, is very suitable for the standard story high-rise, high-rise buildings and multi-family buildings with architectural aluminum sheet templates can be assembled with different specifications according to the project, used the template alterations new buildings, just replace about 20% of the non-standard board.
9). High recovery, salvage large: the material may have been recycled aluminum, aluminum formwork system after retirement, when high residual waste treatment, (my company's recycling per square meter price in about 300 yuan). All materials are aluminum template in raw materials, in line with national regulations on construction projects saving, environmental protection, low-carbon, emissions, and industrial policies for sustainable development.
10). The support system less convenient to walk: the traditional construction method templates floor construction technology, platforms and other commonly used Trestle, labor-material costs. Aluminum template bottom support system to take "single tube vertical independence" support, with an average spacing of 1.2 m, horizontal pull or stayed without help support large operating space, construction personnel access, material handling flow, single support removal easy and convenient, on-site easy to manage.
Aluminum Alloy Formwork VS Timber Formwork
NO. | Reference | Aluminum Alloy Formwork | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality .
2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction
Formwork assembly/inspection
Aluminum formwork system application project
After form removal concrete surface effect
Welcome to visit us