Metal 6061-T6 Aluminum Alloy Formwork System For Construction
USD $180 - $205 /Square Meter
Min.Order:500 Square Meters
Hebei Jinbiao Construction Materials Tech Corp., Ltd.
1.Aluminum Alloy Formwork General Specification
Aluminum Alloy Formwork | |
Material | Aluminum alloy 6061-T6 |
Panel thickness | 4mm |
Rocker | 50mm |
Wall panel | 600(W) X 2300/2450(H) |
Deck panel | 600(W) X 1200(H) |
Deck beam | 150(W) X 900/1050 (H) |
Formwork weight | 18-22kg/m2 |
Carrying capacity | 60kn/m2 |
We can also manufacture upon your requested design with different sizes.
2.Aluminum Formwork System Advantage
1). Construction cycle is short, high efficiency: Aluminum alloy formwork system
for the fast form removal system, generally 18~36 hours to form removal, so only one layer of
aluminum alloy formwork plus three single support can be used, a layer of the normal construction of up
to 3~4 days, thus greatly shorten the construction period, the construction units to save administrative
costs, as well as real estate developers to shorten the development cycle.
2). Reusable low cost: Regulate the construction of a template can be flipped 300 times or more, use
of low cost
3). Easy construction, high efficiency: Aluminum formwork assembly is simple, convenient installation,
simply pro rata increase the standard board, light weight aluminum formwork per square meter 22~25KG.
Construction process is completely assembled by hand, transshipment; does not depend lifting equipment
4). Good stability, high capacity: capacity up to 60KN per square meter.
5). Wide range of applications: Aluminum alloy formwork system is suitable for all building components,
such as load~bearing walls, columns, beams, stairs, balconies, etc. are available through the cement
pouring at once.
Aluminum Alloy Formwork System VS Timber Formwork
NO. | Reference | Aluminum Alloy Formwork System | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks: 1. It will be different ,due to its different price of commodities and cost of labor in the locality .
2. Aluminum Alloy Formwork System contains all supporting, waling, release agent etc which must be
used under construction
Aluminum alloy formwork sysytem forming quality
3.Aluminum Alloy Formwork Design and Production Process
4.Aluminum Alloy Formowork System Show
5.Aluminum Alloy Formowork System including formwork panel, support system,
fastening systems and attachment system.
Formwork Panel
Aluminum Alloy Formwork System Fastenings
Aluminum Formwork System Supporting
Aluminum Formwork System Attachment System
Our workshops
Construction Site ( Macao project )
4. Cetification
Welcome to inquiry-Anping Jinbiao wire mesh fence Factory
Jean Hao
Anping County Jinbiao Wire Mesh Fence Co., Ltd.
Address: P.O. Box 053600, Development Zone, South Of Anping County,
Hengshui, Hebei, China
QQ: 1842332669
Moble: 86-15176919581
Skype: jean.hao51