1.Concrete formwork
Concrete formwork includes aluminum formwork, support system, fastening systems, accessories system. Aluminum concrete formwork is composed of high strength aluminum alloy casting, panel is 4 mm thick aluminum alloy plate, welded to the specially designed. Aluminum concrete formwork overall strength and stiffness are relatively high wooden formwork many times. Support system mainly includes the support head, adjustable steel tube column etc. Fastening systems including fittings, wall screws, back ridge etc. Attachment system mainly includes the form removal device, high stool etc.
concrete formwork - aluminum formwork
concrete formwork - support system
concrete formwork - fastening systems and accessories system
2.Concrete Formwork Advantage
1). Construction cycle is short, high efficiency: Aluminum concrete formwork for the fast form
removal system, generally 18~36 hours to form removal, so only one layer of aluminum concrete
formwork plus three single support can be used, a layer of the normal construction of up to 3~4 days,
thus greatly shorten the construction period, the construction units to save administrative costs,
as well as real estate developers to shorten the development cycle.
2). Reusable low cost: Regulate the construction of a template can be flipped 300 times or more, use
of low cost
3). Easy construction, high efficiency: Aluminum concrete formwork assembly is simple, convenient
installation, simply pro rata increase the standard board, light weight aluminum formwork per square
meter 22~25KG. Construction process is completely assembled by hand, transshipment; does not
depend lifting equipment
4). Good stability, high capacity: capacity up to 60KN per square meter
5). Wide range of applications: Aluminum concrete formwork system is suitable for all building
components, such as load~bearing walls, columns, beams, stairs, balconies, etc. are available
through the cement pouring at once.
Aluminum Concrete Formwork VS Timber Formwork
NO. | Reference | Aluminum Concrete Formwork System | Timber Formwork |
1 | Material cost (Included Support) | $183-216/m2 | $13--16/m2 |
2 | Repeated used | 300times at least | 3-5times |
3 | Safe working load | ≥60KN/m2 | about 30KN/m2 |
4 | Assembling and dismantling labor cost | $3.6-4.2/m2 | $4.2-4.7/m2 |
5 | Recovery value | $67/m2 | $0.8/m2 |
6 | Subtotal artificial materials | $4.4-4.9/m2 | $7.5-8/m2 |
7 | Leveling the wall plastering labor cost | $0.4/m2 | $2/m2 |
8 | Leveling the wall plastering material cost | $0.3/m2 | $2.6/m2 |
9 | Ergonomics | 20m2/day | 15m2/day |
10 | Final economic indicators | $5.9-6.4/m2 | $12-13/m2 |
Remarks:
1. It will be different ,due to its different price of commodities and cost of labor in the locality.
2. Aluminum Concrete Formwork System contains all supporting, waling, release agent etc
which must be used under construction
3.Concrete Formwork General Specification
Aluminum Concrete Formwork | |
Material | Aluminum alloy 6061-T6 |
Panel thickness | 4mm |
Rocker | 50mm |
Wall panel | 600(W) X 2300/2450(H) |
Deck panel | 600(W) X 1200(H) |
Deck beam | 150(W) X 900/1050 (H) |
Formwork weight | 18-22kg/m2 |
Carrying capacity | 60kn/m2 |
We can also manufacture upon your requested design with different sizes.
4.Aluminum Concrete Formwork Design and Production Process
5.Our workshops-concrete formwork
Concrete formwork be packaged pallet or nude
7.Construction Site ( Shanxi Royal Garden Project )
8.Cetification
1. Do your concrete formwork contains other accessories?
Concrete formwork includes aluminum formwork, support system, fastening systems, accessories system.
You can also pick and choose one of them whatever you need.
2. We need some specificial size, can you do?
We can also manufacture upon your requested design with different sizes.
3. How many times your concrete formwork can be used?
Our product can be used at least 300 times, surely, it must bring you a lot of benefits.