KUC755AE105 3BHB005243R0105 ABB Control DCS system module to stabilize inventory
USD $100 - $200 /Pound
Min.Order:100 Pounds
Xiamen xiongba e-commerce Co., Ltd. Zhangzhou Branch
KUC755AE106 3BHB005243R0106 ABB Portal crane power exciter control module
LDGRB-01 3BSE013177R1 ABB Module DCS s800i / O power supply (spot)
PCD230A 3BHE022291R0101 ABB Input and output device of excitation system
PCD235A101 3BHE032025R0101 ABB Central controller (available from stock)
ABB PCD244A101 3BHE042816R0101 Controller drive module inventory
KUC755AE105 3BHB005243R0105 ABB Control DCS system module to stabilize inventory
KUC755AE105 3BHB005243R0105 ABB Control DCS system module to stabilize inventory
Our Email: 2235954483@qq.com
contact number:13313705507
contacts:HE
The undervoltage protection based on calculated positive phase-sequence voltage
can be applied to disconnecting a smaller power plant from the outside network, for
instance in situations where there is a fault in the network which can be critical for
the power plant, such as a short circuit either at the transmission or distribution
network level.
A situation of this kind can be critical for different reasons. The power plant can be
left to feed an isolated network due to a trip caused by a fault. In this case, there is a
risk that the isolated network, which is in asynchronous state compared to the rest of
the network, is reconnected to the network as a result of an autoreclosure, for
instance. In addition, the power plant can also fall into an asynchronous state in a
fault situation. These critical situations can be prevented by disconnecting the power
plant from the network fast enough by tripping the connecting circuit breaker.
The benefit of this function is that the voltage value measured during or after a
network fault is a good measure of how critical the fault is for a smaller power plant.
When the positive phase-sequence voltage value falls below the critical limit, the
power plant has to be disconnected from the network.
REU610 measuring the positive phase-sequence voltage complements other
methods used to disconnect smaller power plants. The application of these methods
is based on frequency and voltage measurement. The undervoltage protection based
on calculated positive phase-sequence voltage requires that the relay is in threephase use.