GF0-57CQD-002
USD $1120 - $2130 /Piece
Min.Order:1 Piece
Temporal Ming sheng automation equipment co., LTD
Brand:OMACO
Type:GF0-57CQD-002
Origin: the United States
Warranty: 365 days
Colour: new/used
Shipping method: Courier delivery
Spare parts spare parts, the main DCS control system of PLC system and the robot system spare parts,
Brand advantage: Allen Bradley, BentlyNevada, ABB, Emerson Ovation, Honeywell DCS, Rockwell ICS Triplex, FOXBORO, Schneider PLC, GE Fanuc, Motorola, HIMA, TRICONEX, Prosoft etc. Various kinds of imported industrial parts
The software performs cyclic battery voltage level tests via a dedicated LED control input. The battery provides back-up power for both the application memory and the real time clock during power down. The battery is either accessible via the PM8xx cover panel or externally connected to the external battery connector. Battery voltage is checked by the software. Voltage is common for both the internal and external battery. For this reason the internal battery should be removed when using the external battery, since having two batteries connected in parallel will result in greatly reduced capacity. (2) Only for PM891 (3) Not valid for PM891 (4) Only CN1 for PM851/PM851A. Do not connect to CN2.
Refer to relevant document for information on: • Firmware download • Controller IP address • Downloading application • Updating firmware Start-up in Redundant Configuration (CEX Bus Considerations) The redundant configuration using CEX bus and CEX modules is supported along with the processor modules PM861, PM864, PM865, PM866 and PM891. At start-up, some things regarding the CEX bus and CEX modules have to be considered when starting up a redundant AC 800M system: • Without using BC810 units: – At least one CEX module must be inserted, if there are base plates without inserted modules in other positions.
After having rebuilt the hardware on the CEX bus, that is, after removing or adding a number of base plates (equipped with CEX modules or not) the upper CPU (the CPU connected to the part of the RCU Link cable that is marked “UPPER”) must be started as the primary CPU the first time.