JIS G3458 Alloy Steel Pipes
USD $1 - $1
Min.Order:15
Jiangsu Huacheng Industry Pipe Making Corporation
AISI-1541 of ASTM A519 for Seamless Carbon and Alloy Steel Mechanical Tubing
ASTM A312/A 312M Seamless, Welded, and Heavily Cold Worked Austenitic Stainless Steel Pipes
ASTM A269 – Seamless and Welded Austenitic Stainless Steel Tubing for General Service
DIN 17456-85 GENERAL PUROSE SEAMLESS CIRCULAR STAINLESS STEEL TUBES
Product particular communication:
1) Standard Name: JIS G3458 Alloy Steel Pipes
2) Monthly Capacity: 3500 tons.
3) Steel Grade: STPA22(T12) STPA23(T11) STPA24(T22) STPA25(T5)
3) Delivery Condition: BK, BKS, GBK, NBK,Stress Relief, Normalizing, Spheroidize Anneal, Annealing, Bright Annealing, Normalized, Quenched and Tempered, Solution Annealing, etc ;
4) Surface treatment: Special Coating, Galvanized, immersion oil, lacquer, passivation, phosphating,etc; Or Oil-dip paint black with two plastic caps on each end
5) Inspection: Strictly according to the standard requirements and offer the original MTC (EN10204.3.1/3.1B)
6) Relevant Test: ASTM 450-Chemical Component Analysis,Mechanical Properties(Ultimate tensile strength,Yield strength,Elongation),Technics Properties(Flattening Test,Flaring Test,Bending Test,Hardness Test,Blow Test,etc), Exterior Size Inspection, Nondestructive electric Test,Hydrostatic Test;
4) Marking: As per customer's requirement
6) Packing: Hexagonal bundles with several steel strips, Wrapped in waterproof paper, PVC sleeve,and sackcloth with several steel strips or packed in heavy tri-wall boxes, wooden boxes, wooden slats as requires;
7) Packing Type: Round , Square, Rectangle, Hexagon. Streamline, etc;
9) Applications: Boiler and Heat Exchanger(Wal panel ,economizer,reheater,superheater and steam pipeline of boilers), Hydraulic and Petrochemical Purpose, etc.
8) Place of orgin: China
Mobile: +86 138 128 775 59 -->Terry(Chief Business Executive Officer)
Email: order@hc-pipe.cn
Commercial Information:
1) Delivery : Within 45 days ready at mill ;
2) Min Order : 15 Ton;
3) Packing way : As per our export standard for shipment ;
4) Term of payment : 30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C ;
5) Delivery Port : Shanghai Port ;
6) Offer Validity : 5-7 Days ;
7) Container : 20' or 40', etc ;
8) Manufacture methods : Cold Finished method.