STPT370 Carbon Steel Pipes for High Temperature Service
USD $10 - $10 /Metric Ton
Min.Order:5 Metric Tons
Jiangsu Huacheng Industry Pipe Making Corporation
Specification Details:
1) STPT 370 Chemical Component Analysis(%):
C:<0.25 Si: 0.10-0.35 Mn: 0.30=0.90 P: <0.035; S: <0.035
2) Monthly Capacity: 5000 tons.
3) SR Condition's Mechanical Properties:
Ultimate Strength: > 370 Mpa; Yield Strength: > 215Mpa; Elongation: > 30%;
3) Delivery Condition: Annealed(A), Bright Annealing, Normalized(N), Stress Relief Or Finish Anneal(SR), Quenched and Tempered(Q+T), etc;
4) Surface treatment: JIS G3456-Temporary Coating, Special Coating, Galvanized, immersion oil, lacquer, passivation, phosphating,etc; Or Oil-dip paint black with two plastic caps on each end
5) Inspection: Strictly according to the standard requirements and offer the original MTC (EN10204.3.1/3.1B)
6) Relevant Test: JIS G3456-Chemical Component Analysis,Mechanical Properties(Ultimate tensile strength,Yield strength,Elongation),Technics Properties(Flattening Test,Flaring Test,Bending Test,Hardness Test,Blow Test,etc), Exterior Size Inspection, Nondestructive electric Test,Hydrostatic Test, magnetic particle testing;
4) Marking: All tubes are eddy current tested and are marked with size, cast number and specification. Or as per customer's requirement;
6) Packing: Hexagonal bundles with several steel strips, Wrapped in waterproof paper, PVC sleeve,and sackcloth with several steel strips or packed in heavy tri-wall boxes, wooden boxes, wooden slats as requires;
7) Packing Type: Round , Square, Rectangle, Hexagon. Streamline, etc;
9) Applications: Hydraulic and Petrochemical Purpose, Boiler & Heat Exchanger,etc.
8) Place of orgin: China
Mobile: +86 138 128 775 59 -->Terry(Chief Business Executive Officer)
Email: terry@hc-pipe.com
Commercial Information:
1) Delicery time: (45-60) days ready at mil also according to the actual weightl ;
2) Minium order : 5 Ton; ( some specification are excepted)
4) Term of payment : 30% T/T within 3 days after signing the contract, balance 70% before shipment. Or 30%T/T +70% irrepealable L/C;
5) Delivery Port : Shanghai Port ;
6) Offer Validity : 5-7 Days ;
7) Container : 20GP or 40GP or Bulk ;
8) Manufacture methods : Cold Finished method or hot finished Method.