High Temp Water Solenoid Valve With Pilot Piston Type G3/8\" - G2\" Port Size Stainless Steel Valve Bo
Negotiable /Set
Min.Order:1 Set
Electromagnetic Directional Type Charging Hydraulic Accumulators Nitrogen Charging Vehicle
Direct Operated Manual Hydraulic Directional Valves With Inductive Position Switches
0.5-100bar 2 way SS304 1/2 inch water high pressure Water Solenoid Valve 24V DC stainless steel
Manual Directional Valve With 35mpa Max Operating Pressure 450l/Min Max Flow
50 bar High Pressure High Temperature Solenoid Valve 1/2 BSP Orifice 12mm NC 5404-04 Burkert Type
N.C. steam solenoid valve 300°C high temperature stainless steel valve PTFE
Voltage: 110V AC ,220V AC ,12V DC ,24V DC .
Note: If you do not remark voltage of you need , you will received 220V AC ,thanks .
Specification | Pipe | Orifice | CV | Pressure (bar) | |||||
AC | DC | ||||||||
Model | mm | Air | Water | Oil | Air | Water | Oil | ||
PH-10 | 3/8" | 15 | 4.5 | 0.5-16 | 0.5-16 | 0.5-13 | 0.5-16 | 0.5-16 | 0.5-13 |
PH-15 | 1/2" | 15 | 4.5 | ||||||
PH-20 | 3/4" | 20 | 9.3 | ||||||
PH-25 | 1" | 25 | 12 | ||||||
PH-32 | 1-1/4" | 32 | 24 | ||||||
PH-40 | 1-1/2" | 40 | 29 | ||||||
PH-50 | 2" | 50 | 48 |
Dimensions
Orifice(mm) | A | B | C | D |
DN15 | 75 | 48 | 173 | 13.5 |
DN20 | 83 | 60 | 185 | 16.5 |
DN25 | 100 | 72 | 198 | 21 |
DN35/40 | 130 | 96 | 200 | 28 |
DN50 | 155 | 122 | 200 | 34 |
Materials of construction | ||
Parts in contact with the medium | ||
Valve of body | Brass | SS304 |
Seals | EPDM ,FKM .PTFE | |
Magnetic isolation pipe | SS304 | |
Core | Stainless steel alloy | |
Spring | SS304 | |
The shading | Copper |
Pattern: | Two-port two-position |
Principium: | pilot piston type |
Control mode: | normally close |
Valve body: | stainless steel |
Diaphragm material: | -10~300°C PTFE |
Working pressure: | 0.5~16bar |
Max pressure: | 16bar |
Voltage: | AC220V AC110V DC12V DC24V |
Medium: | Air ,water ,hot water ,steam ,oil ect. |
Application: | high pressure large-flow steam water control system |
Maintenance instructions:
1. attention to check the use of components, in the transport process is damaged, and then install the use of.
2. When installing, please note that the gas flow direction and the takeover are correct.
3. when using, please strictly comply with the technical requirements, such as the operating voltage, operating frequency, working pressure, the use of temperature, the whole machine debugging, it is recommended to use a manual device debugging, and then through power debugging.
4. Please pay attention to dust, it is recommended to install the exhaust port or muffler muffler throttle.
5. When connecting pipe, pay attention to only release the strap around the joint may not exceed the end face of the tooth, and pay attention to the elimination of pipe fittings, metal particles inside the pipe, dust and oil, etc
Feel free to contact us at anytime if you have any problems or questions on your purchase. We will resolve any problems such as damaged, not as described, missing parts, and lost items. All emails will be replied within 24 hours except Saturday. & Sunday and Chinese holidays. If you have any other requirements or questions, welcome to visit our website, or just contact with us directly. Thank you!