Solid liquid separation rotary mechanical grille machine for sewage pretreatment
USD $4,000 - $59,000 /Set
Min.Order:1 Set
Shandong Jinhaosanyang Environmental Protection Machine Co., Ltd.
XGC Sewage pretreatment mechanical grille bar screen machine
Structure and working principle
XGC type rotary solid and liquid separator is by ABC engineering plastic, nylon 1013, nylon 1010 B or stainless steel made of special shape the teeth, in a certain order in the teeth of the assembly axis, form enclosed the tooth chain, the lower part installed in the canal into, in the rotation system leads, the whole rake the tooth chain (YingShui face) and bottom-up movement, and with a solid material from liquid of separation of the liquid from the tooth of the gate in the gap through continuous in the whole process.
Because the tooth structure reasonable design, make the tooth chain carries sundry to reverse the top move, before and after two rows of the tooth connected to relative motion between the clean, prompting sundry rely on gravity fall off; At the same time the pair set with the equipment tooth chain in the opposite direction of movement BanShua glue, in order to ensure that each row rake the tooth movement to the position of the brush can see completely clean.
Main features
1, the structure compact integration, a high degree of automation (can connect a PLC microcomputer control system to control the operation of equipment), the province energy consumption, low noise, high separation efficiency.
2, continuous decontamination non-clog, slag discharge clean.
3 and corrosion resistance (all moving parts are stainless steel and nylon).
4, safety operation and transmission systems set up mechanical overload protection and overload limiter dual protection, overload the instrument can display limiter transmission load, when underwater chain or the tooth is stuck, electric machine will automatically cut off the electricity. Instruments with remote monitoring interface, which can realize the machine fault remote monitoring.
Technical datas
Electric control cabinet
Workshop picture
Transportation
Order flow
1. Q: How to buy your interested products?
A: You can provide us the water sources, water quality, flow rate and ground area, material requirements about your project (More details, please contact us).
2. Q: How to pay?
A: TT and L/C are acceptable and TT will be more appreciated. 30% deposit before producing, 70% balance before loading by TT.
3. Q: What is the delivery time?
A: It depends on order quantities. Generally speaking, the delivery time will be within 4 to 6 weeks.
4. Q: How to pack the products?
A: We use standard package. If you have special package requirements, we will pack as you required, but the fees will be paid by customers.
5. Q: How to install after the equipments arriving destination?
A: We will provide detailed illustrations to you. If it is necessary, we will send technicians to help you. However, the visa fee, air tickets, accommodation, wages will be paid by buyers.
6. Q: How long is the validity?
A:The validity is 12 months from B/L date.