High-efficiency Aluminum Alloy Formwork System

High-efficiency Aluminum Alloy Formwork System

USD $203 - $206 /Square Meter

Min.Order:500 Square Meters

Supply Ability:
5000 Square Meter / Square Meters per Month
Port:
Tianjin
Payment Terms:
T/T

Quick Details View All >

Place of Origin:
Hebei, China
Brand Name:
JinBiao
Model Number:
JB-HQ-N006

Hebei Jinbiao Construction Materials Tech Corp., Ltd.

Business Type: Manufacturer,Trading Company
Hengshui Hebei China
Main Products: Wire Mesh Fence Sound Barrier ,Aluminum Shuttering ,Mesh Fence ,Guardrail Crash ,Slope Protective Screening

Product Details

Specifications

aluminium alloy formwork system
1.Total system forms the complete concrete structure
2.Convenient
3.Easy operation

ALUMINIUM ALLOY FORMWORK SYSTEM / ALUMINUM CONCRETE FORMS

 

1. Aluminum Alloy Formwork System

Material

6061-T6 Aluminum alloy

 

 

Main Components

Beam

column

wall

Prop

Others

 

Applications

Residential building

Exhibition setup

All the towers can be connected together for multi-purpose

Safe working load

≥60KN/m2   

Size

Non-standard: custom-made as per buy's requirements

 

 

Features

Easy to Handle

One-time Pouring

High Concrete Pouring Rate

More Reuses

Great Recyclable Value

Environmental Friendly

   

Aluminum Alloy Formwork Advantage

 

1. Construction cycle is short, high efficiency : Aluminum formwork system for the fast form removal system, generally 18~36 hours to form removal, so only one layer of aluminum templates plus three single support can be used, a layer of the normal construction of up to 3~4 days, thus greatly shorten the construction period, the construction units to save administrative costs, as well as real estate developers to shorten the development cycle .

 

2. Reusable Low cost : Regulate the construction of a template can be flipped 300 times or more, use of 

low cost

 

3. Easy construction, high efficiency : Aluminum formwork system assembly is simple, convenient installation, simply pro rata increase the standard board, light weight aluminum template per square meter 18~25KG. Construction process is completely assembled by hand, transshipment; does not depend Lifting Equipment

 

4. Good stability, high capacity: capacity up to 60KN per square meter.

 

5. Wide range of applications :  Aluminum formwork system is suitable for all building components, such as load~bearing walls, columns, beams, stairs, balconies, etc., are available through the cement pouring at once .

 

Aluminum Alloy Formwork  VS  Timber Formwork

NO.

Reference

Aluminum Alloy Formwork

Timber Formwork

1

Material cost (Included Support)

$183-216/m2

$13--16/m2

2

Repeated used

300times at least

3-5times

3

Safe working load

≥60KN/m2

about 30KN/m2

4

Assembling and dismantling labor cost

$3.6-4.2/m2

$4.2-4.7/m2

5

Recovery value

$67/m2

$0.8/m2

6

Subtotal artificial materials

$4.4-4.9/m2

$7.5-8/m2

7

Leveling the wall plastering labor cost

$0.4/m2

$2/m2

8

Leveling the wall 

plastering material cost

$0.3/m2

$2.6/m2

9

Ergonomics

20m2/day

15m2/day

10

Final economic indicators

$5.9-6.4/m2

$12-13/m2

Remarks:

 

1. It will be different ,due to its different price of commodities and cost of labor in the locality .

 

2.Aluminum Formwork System contains all supporting, waling,release agent etc which must be used under construction

 

 High-efficiency Aluminum Alloy Formwork SystemHigh-efficiency Aluminum Alloy Formwork SystemHigh-efficiency Aluminum Alloy Formwork System

High-efficiency Aluminum Alloy Formwork SystemHigh-efficiency Aluminum Alloy Formwork System

High-efficiency Aluminum Alloy Formwork System

Contact Supplier

Ms. Coral hu Chat Now
Telephone
86-311-80979540
Mobile
13833129670
Fax
86-311-80979540
Address
Development Zone, South of Anping County Hengshui,Hebei

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Construction & Real Estate > Formwork
Categories
Hi~