Toothed Roll Crusher
Negotiable /Piece
Min.Order:1 Piece
Zhengzhou Prominent Technology Co., Ltd.
Preparation and examination before the operation 1, broken stone must be checked before the start of each lubrication point is normal, whether the blockage, leakage. 2, the operating handle dry pump enough fuel to make the lubrication points and refueling. 3, check the instrument is intact. 4, adjust the port of discharge. 5. Check whether the ore crushing cavity or other non-broken. 6, V-belt and locking spring tension to moderate. 7, check the electrical interlocks, light pick No. protection facilities are complete and all normal. 8, check the connecting bolt without loosening. of Toothed Roll Crusher
After Toothed Roll Crusher start, if found to have unusual circumstances, should be immediately stopped, the reason to exclude risks to be identified before they start again Bearing areas are the most vulnerable components, because it is in use, wear large need for regular maintenance, regular oil to increase bearing life. Steel jaw crusher requires large furnaces for melting the steel mold casting. Now basically used electric furnace, the higher the production process. General by a professional casting plant jaw crusher housing body processing.
Features
Toothed Roll Crusher Long Service Life, Large Feeding Size, Stable
Toothed Roll Crusher Operation Notes:
Broken jaw broken jaw cut the belt conveyor is regularly driven machine stone production line conveyors are indispensable to adjust the tightness of credit on a regular basis to ensure that both sides of the triangle conveyor belt conveyors should be grouped by force optional dual-motor drive it every time they leader degree as consistent as possible. If found too much wear on the belt, please immediately replaced. Jaw crusher sudden shutdown: Clear the discharge port blockage, ensuring a smooth flow of material; 2) tighten or replace V-belt; 3) reinstall or replace adapter bushing; 4 ) alignment workplace voltage, to conform to the requirements of the host operating voltage; 5) Replace the bearings.
Maintenance & Attention
Jaw crusher maintenance focuses rack chassis is the foundation since broken jaw, and only stable foundation in order to protect a broken jaw safe and efficient operation. According to Tian Rong machine broken jaw after-sales service for many years of experience, we believe that broken jaw rack routine maintenance parts that require special attention is not much, but the site operator must attach great importance. Usually broken jaw rack problems are caused by related parts, specifically summed up includes the following aspects: ① severe beating rack jaw broken, loose or broken bolt: tight bolt or replace broken bolts; ② fly counterweight sheave position deviation: Remove the fly sheave shaft cover plate, unscrew the fly, Lunzhang sleeve slot bolts, alignment fly counterweight sheave block position, and then sets up tight tight bolts; ③ host foundation is not solid, no isolation measures: jaw crusher reinforced base, padded sleepers or rubber, etc; ④ jaw broken rear of the chassis to produce percussion, rod not tightened, toggle plate and moving jaw hit the bracket to adjust the seat cushion: fastening rod; ⑤ lever and move the lower jaw hooks friction: a mechanical device to check whether the failure of the spring tension, such as failure of the replacement spring, adapter rod or retightening spring; ⑥ mutual impact between the spring and spring seat: the spring seat in place and tight tie rod nuts to the proper position.
To Choose a Right Toothed Roll Crusher
Productivity and productivity nature of the ore cone crusher, crushing chamber shape, the type of crusher, specifications and operating conditions, and many other factors, but also with the crusher in the process configuration status. There is currently no method to fully reflect the theoretical calculation of these factors are generally calculated using the following empirical formula. When broken open, cone crusher productivity. Q = K1K2q0eδ / 1.6 (t / h)