LDF -100 medical solid waste incinerator
USD $8,000 - $39,000 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
LDF -100 medical solid waste incinerator
LDF series medical waste incineration installation with the characteristic of small size, high efficiency and reasonable incineration, leading technology, higher harmless degree, is the ideal garbage treatment facilities apply to all kinds of hospital, hotel, station.
Main Features:
1. The gasifying incineration technology to be applied to the incineration injector, feeding container and other medical equipment as well as different paper slash, bandage, cotton column, different kinds of medical pollutants and various wastes discharged by hospitals and medical organization.
2. The gasifying incineration way is utilized and the rubbished produced each day is able to handle the one-off incineration treatment.
3. The gasifying incineration, mixed incineration, burn-out treatment and other technologies are used to make the content of the smog exhaust and dust lower than the discharge standard regulated by the nation.
4. Fully seal operation is adopted to be applied to dealing with the infectious medical waste and avoid the secondary pollution.
5. Small volume and site area.
6. The series of incinerator are divided into the fuel and gas kind which can be selected according to the different needs of the users.
LDF-100 Model medical solid waste incinerator
Main parameters
Applicable hospital size (number of beds) | 150-200 beds |
Burning Ability | 50-100kg/time (daily incineration 3-6 times) |
Size of the incinerator | 2.0m×1.4m×3.4m |
Volume of incinerator | Gasification room1.2m3,secondary burning room 0.6m3,mixing burning room0.06m3 |
Size of the filling entrance | 700mm×900mm |
Chimney | Height 10m, out-radius Ø300mm |
Air blower | 0.75kw |
Auxiliary burner | Power 0.11kw, oil consumption volume 10-20kg/h |
Re-burning burner | power 0.22kw,oil consumption volume 7-14 kg/h |
operation voltage | 220V or380V |
weight | About 6500kg |
LDF-100 Main configuration list
Equipments name | specification | quantity | unit |
Furnace main body(first burning room) | A3 steel,refractory material | 1 | set |
Auxiliary burner | power 0.11kw | 1 | set |
Re-burning burner | Power 0.22kw | 1 | set |
secondary burning room | A3 steel,refractory material | 1 | set |
Mixing burning room | A3 steel,resist high temperature material | 1 | set |
gas fume purify room | A3 steel,resist high temperature material | 1 | set |
oil storage tank | steel plate | 1 | pc |
air blower | 0.5 kw | 1 | set |
ventilate pipe | A3 steel pipe | 1 | set |
chimney | A3 iron pipe,out-radius 300mm height 10m | 1 | set |
thermoelectric couple | Resist high temperature 1200℃ | 1 | set |
Electronic control system | Install in the main body | 1 | set |
installation attachment |
| 1 | set |
Installation manual and video disk |
| 1 | set |
LDF-100 incinerator packing list
item | specification | Weight/volume
| package | remark |
main body | 2300×1570×1700mm | 4400kgs/6.1m3 | 1 | Main body contain burner,blower,electric control cabinet etc |
Second burning chamber and mixed burning chamber | 2000x1300x1120mm | 1240kgs/2.9m3 | 1 | Contain tray height |
Flue gas purification chamber | Ø880×1100 | 480kgs/0.66m3 | 1 |
|
chimney | 300,height 5m | 75kgs/0.35m3 | 1 |
|
oil tank | Ø600×Ø2000 | 42kgs/0.21m3 | 1 |
|
oil tank bracket | 2500×Ø400 | 13kgs/0.56m3 | 1 |
|
Air hose | 2100*1400*260mm | 20kgs | 1 |
|
sum: |
| 6270kgs/10.78m3 | 7 |
|