Sequencing batch reactor activated sludge process(SBR) sewage treatment plant
USD $2,000 - $10,000 /Set
Min.Order:1 Set
Qingdao Yimei Environment Project Co., Ltd.
SBR sewage treatment plant
description of the process:
designed for sewage and anything like industrial organic wastewater treatment, its main processing method is used at present the mature biochemical treatment technology, biological contact oxidation, water quality parameters according to general life wastewater design calculation, press BOD5 200mg/l, average 20mg/l according to water BOD5 design. which contain 6 section as follows:
1). beginning early: this equipment pond for pond, sewage leaking Kennedy streaming rising velocity in traps 0.6-0.7 mm/SEC, precipitate down with air mention to sludge sewage sludge pond. (note: DSW - A0.5-5m3 / h do not set beginning pond)
2).contact oxidation tank: beginning the sink are analysed to contact tank biochemical treatment, contact oxidation tank has three levels, total retention time for more than four hours, heavy-duty equipment contact oxidation time can reach 6 hours, packing for novel trapezoidal packing, easy conjunctival, no congestion, packing for 160m2 / m3 than surface area than gas-water contact, pool in 12:1 around. (note: DSW - A0.5-5m3 / h contact pool for level 2)
3). second settling tank: the sewage flows into biochemical second pond, the second pond leaking for two vertical flow velocity parallel-running, rise 0.3-0.4 millimeter/SEC, row mud USES air mention to sludge pond. (note A0.5 DSW - 5m3 / h sludge artesian - to sludge pool)
4). sterilization tank and disinfection device: according to the standard: "disinfection pool TJ14 74" standard for 30 minutes, if the hospital sewage, sterilization tank can increase the retention time to 1-1.5 hours. By using solid chlorine slices of dissolved disinfection way, contact with disinfection disinfection pool, according to the size of the device can change constantly, &safe-durable
Variable dosage, achieve much more medicine, less water water less the purpose of dosing, need other device can be made separately.
5). sludge tank: beginning pond, the second pond with all the sludge are DSW - A lift to the air within the sludge pond aerobic digestion, sludge pond with supernatant fluid flowing to contact oxidation in the pool before treatment, digestion, excess sludge rarely after general 1-2 years clean up, cleaning method can be used FenChe absorption from the sludge pond inspection hole stretch into sludge after bottom department for suction can. Sinotrans (DSW - A0.5-5m3 / h sludge using anaerobic digestion)
6). Air blower room, fan: equipment DSW - A computer in the wind, the wind above the sterilization tank engine room with double layer sound insulation, 2 imported A muffler, fan filter, so runtime without noise. Fan adopts two L ROM dimitrios blower, it can automatic alternating single machine operation, the fan operation life of 30,000 hours.
n operation life of 30,000 hours.