Batch-Type Low Temperature Carbide Furnace Two-furnace Structure
Negotiable
Min.Order:1
AT232B Batch-type Low Temperature Carbide Furnace consists of pre-heating tube, working furnace tube, steam generator and flow controlling system. The pre-heating tube has two heating sections and the working furnace tube has three heating sections. Pre-heat steam produced by steam generator, air or oxygen to 600℃ in the pre-heating tube and then enters into the working heating furnace tube through pressure-adjusting valve and flowmeter. The pre-heat tube is connected with the working furnace tube by a rapid-connection connector and they are horizontally laid in rank. The heating furnace for the working furnace tube is open-able and dischargeable, convenient to observe. There is stainless steel filtering screen in the pre-heating tube for uniformly heating gas.
1.Two-furnace structure;
2.Sheet metal bracket with electrostatic spraying plastics;
3.Heat-resistant stainless steel pre-heating tube and quartz stopper;
4.Mollite fiber open-able heating furnace and tube heating furnace;
5.Steam generator with the flow-meter to control pressure;
Model | AT232B |
Temperature range of outlet air from pre-heating tube | 500~600℃,adjustable |
Max. temperature of constant temperature zone | 1200℃ |
Temperature controlling accuracy | 0.5% |
Temperature controlling mode | Intelligent controller |
Heat mode | 2-section tube heating tube for pre-heating tube 3-section open-able resistance furnace |
Size of working furnace | ¢89*1500mm |
Size of pre-heating furnace | ¢89*1200mm |
Connector | ¢40 stainless steel corrugated pipe |
Steam source | Steam generator with flowmeter to control pressure |
Packaging | ||
Size(cm) | 90(L) * 120(W) * 150 (D) | |
Weight | 500Kg | |
Packaging Details | 1. The equipment is covered with film is protect it from water vapour during the trip. 2. The box is filled with foam to protect the equipment from impact. 3. Exported wooden box made from plywood, don't need fumigated. |
Payment Item | T/T | EXW 30% T/T in advance, paid the balance before shipment FOB CFR(C&F) 30% T/T in advance,paid the balance against copy of B/L CIF | 30% T/T in advance, paid the balance before shipment | ||
FOB | |||||
CFR(C&F) | 30% T/T in advance,paid the balance against copy of B/L | ||||
CIF | |||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||
West Union | Amount lower than 50,000usd | ||||
Delivery Time | 7~10 days after receiving payment for one container |
Since 1982 with more than 20 years' experience
Two Year Warranty for whole product
Video and user manual for training
Installation and training service is available
Free sample testing before order is available
15 working days lead time for most product
Lily Cheng | ||
Website | ||
Mobile Phone | +86 180 5517 3820 | |
Whatsapp | +86 180 5517 3820 | |
Skype | 1933039910@qq.com | |
Wechat | +86 180 5517 3820 |