Lab Pirn Winding Machine For Shuttle Weaving
Negotiable
Min.Order:1
Lab Two-For-One Winding Machine With the function of Winding and Twisting
Dual-plunger Melt Spinning Machine For Disassemble-able Structure
Continuous Melt Spinning Machine specially designed for small batch production test
Semi-Automatic Sample Loom with PLC control touch and USB interface to share designed patters
AT209C Pirn Winding Machine is intelligent vertical pirn winding machine, an necessary equipment in preparation for shuttle weaving. It is used to wind yarn from bobbin onto pirn for shuttle loom. It is applicable to various yarns, such as pure cotton, polyester cotton, ramie and so on.
Double-side vertical-type;
Touch screen display and PLC control;
Stepping motor to control the winding stroke and the beginning and end positon of winding is adjustable;
Adjustable winding speed with variable-frequency motor control and three-belt driving;
Model | AT209C | ||||
Type | Double-side | ||||
Number of spindles | 12, 28, 60, 92, 124, 156, 188, 220, 252, 284, 316 | ||||
Spindle gauge | 70mm | ||||
Spindle speed | 2560~3800r/min, adjustable | ||||
Max. winding diameter | ¢32mm | ||||
Max. winding height | 205mm | ||||
Power supply | AC380V 50Hz, three-phase | ||||
Dimensions for 156 spindles | 6220×760×1950(L×W×H) | ||||
Weight for 156 spindles | 1.8T |
Packaging | ||
Size(mm) | 6220 (L) * 760 (W) * 1950(D) | |
Weight | 1800Kg | |
Packaging Details | 1. The equipment is covered with film is protect it from water vapour during the trip. 2. The box is filled with foam to protect the equipment from impact. 3. Exported wooden box made from plywood, don't need fumigated. |
ERIC QIN | ||
Website | ||
Mobile Phone | +86 188 5510 5986 | |
Whatsapp | +86 188 5510 5986 | |
Skype | eric-qlk | |
Wechat | +86 188 5510 5986 |
Payment Term | T/T | EXW | 30% T/T in advance, paid the balance before shipment | ||
FOB | |||||
CFR(C&F) | |||||
CIF | |||||
L/C | L/C amount above 50,000 usd, we can accept L/C at sight | ||||
West Union | Amount lower than 5000usd | ||||
West Union | |||||
Delivery Time | 7~10days after receiving payment for one container |
Since 1982 with more than 20 years' experience
Two Year Warranty for whole product
Video and user manual for training
Installation and training service is available
Free sample testing before order is available
15 working days lead time for most product