SSQ Sand and stone aggregate bulk machine
SSQ Sand and stone aggregate bulk machine
SSQ Sand and stone aggregate bulk machine
SSQ Sand and stone aggregate bulk machine
SSQ Sand and stone aggregate bulk machine

SSQ Sand and stone aggregate bulk machine

Negotiable /Set

Min.Order:1 Set

Supply Ability:
80 Set / Sets per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
20 days

Quick Details View All >

Brand Name:
jiangsu lvrui
Place of Origin:
China

Jiangsu Lvrui Machinery Co., Ltd

Business license
Business Type: Manufacturer
Main Products: Bulk cement machine ,Clinker bulk machine ,Air conveying chute ,Pneumatic on off valve ,Electric flow valve ,Bag filter ,Gate valve ,Louver valve ,Open air box ,valve

Product Details

1、 Overview

Sand and stone aggregate bulk machine SSQ sand and stone aggregate automobile bulk machine is the equipment that automatically transfers the stone aggregate (≤ 50mm) to the clinker bulk truck and ship from the warehouse.  SSQ sand and stone aggregate bulk equipment (see Figure 1) is mainly composed of manual rod valve, electric sector valve (or pneumatic gate valve), winching device, telescopic unloading device, dust collection hose, capacitive limit switch, electronic control system and other parts.  Users can also choose the side of the sand aggregate bulk equipment.  (See Figure 2) 


2、 Technical Parameters 


Note: the machine can meet the requirements of temperature and particle size of materials by changing the material. 


3.    Operating principle

When the vehicle enters the loading position, open the bar valve corresponding to the number of bars.  Hold down the control cabinet "drop button", cutting head are obtained automatically disconnect lifting motor power, according to the "loading button" into the discharge state, an auxiliary equipment will start to work accordingly, discharge of dust through the feed hopper, the telescopic hose into the dust collector to collect dust purification, the gate of the material, the cutting head rise, alarm, rising distance to set before loading,  If the rise distance is 1 meter, set the time of the time breaker to T=1/ V.  Loading is always in the process of rising, when the material head is full, and then repeat the above action, after reaching the full position, press the stop button to make the vibration machine brake, or close the fan valve to stop working.  After parking, press the up button to let the hopper leave the material a certain distance to ensure the movement of the transport vehicle, and then align with the second unloading station.  Until the whole bin is full.  

1. Schematic diagram of clinker bulk machine at the bottom of warehouse (Figure 1) 


2. Schematic diagram of clinker bulk machine at warehouse side (Figure 2)

Contact Supplier

Mr. shen manager Chat Now
Telephone
86-182-61998937
Mobile
86-18261998937

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > General Industrial Equipment > Material Handling Equipment > Other Material Handling Equipment
Categories
Hi~