400 Ton FRP Material Open Type Cross Flow Cooling Tower
400 Ton FRP Material Open Type Cross Flow Cooling Tower
400 Ton FRP Material Open Type Cross Flow Cooling Tower
400 Ton FRP Material Open Type Cross Flow Cooling Tower
400 Ton FRP Material Open Type Cross Flow Cooling Tower

400 Ton FRP Material Open Type Cross Flow Cooling Tower

Negotiable

Min.Order:1

Supply Ability:
1000 per Month
Payment Terms:
T/T Credit Card

Hengshui Aoliande Trading Co., Ltd.

Business Type: Trading Company
Main Products: , , ,

Product Details

Product Description

100 Ton Industrial FRP Square Type Cross Flow Water Cooling Tower

Square cross flow cooling tower adopts air inlet on both sides and fans on the top to make air exchange with hot water through fillers on both sides of the tower, and then the hot and humid air is discharged to the outside of the tower. The point wave plate with convex points on both sides of the packing is adopted. The point wave plate is bonded into a whole by the mounting head to improve the rigidity. The convex points on both sides can also avoid direct dripping, so the water film forming ability is improved.
Specification
The composition of the square cross flow cooling tower:
(1) Panel: glass fiber reinforced plastic, smooth and beautiful surface, corrosion resistance, anti-aging.
(2) Fill: modified PVC bidirectional point wave plate, good thermal performance, small airflow resistance, good rigidity, heat resistance 75ºC, cold resistance, flame retardant.
(3) Fan: The blade is made of aluminum alloy. The fan has the characteristics of reasonable aerodynamic force, large air volume, high efficiency, low noise and corrosion resistance.
(4) Motor and reduction gear: auxiliary equipment.
(5) Cloth sink: glass fiber reinforced plastic material, uniform water distribution, ultra-low noise type with cover plate to
cover light, prevent debris flying in, reduce splashing sound.
(6) Muffler cover: glass fiber reinforced plastic, sticky cavity type flame retardant PVC film muffler material.
(7) Louver: made of glass fiber reinforced plastics, waterproof to splash out, and can make the air flow into the tower even.
(8) Water tank: made of glass fiber reinforced plastics, which can collect water. It is equipped with automatic water
replenishment facilities, and can absorb water directly in closed circulation.
(9) Skeleton: it is assembled with folded steel, with good rigidity, light weight, convenient transportation and installation, and anticorrosion by hot-dip galvanizing.
Details Images
Motor:Three phase asynchronous motor, advantages:efficient,energy-saving,Large starting torque, excellent performance,low noise, slight vibration,high reliability convenient in operation and maintenance and so on.Power class and installation size are in accirding with the IEC standard Fan:Use high quality aluminum alloy cross fan with adjustable angle.Meet customers different requirements for the process like blast capacity.The fan must through strict balance and or ientate before delivery,four leaf forward plate type design, to make the force of every piece is small, Advantages: little vibration, low noise, high efficiency, power saving.
COOLING TOWER FILL
Drift eliminator:drift eliminator use PVC extrusion molding. Material:Modified PVC Counter flow cooling tower's noise level:Normal Advantages:Collect water with high efficiency,little gas resistance,high strength,non-defrmation, easy installation and maintenance,long service life,good flame retardancy and so on. Standard:High 12M,14M Effect:Effectively reduce water vapor, water mist,water saving.
Company Profile
Customer Photos
Packing and Shipping
FAQ
Q: Are you trading company or manufacturer ? A: We are a company with trading company and factory together. Our trading company is named Hengshui Aoliande Trading Co., Ltd and factory named Hengshui Jiubo Composites Co., Ltd. Q: I didn't see dimension info or find the size I need, can you make it per my requirements? A: For FRP products, all dimesion can be customized. We can make it per client's requirement. Q: How long is your delivery time? A: Generally it is 5-10 days if the goods are in stock. or it is 15-20 days if the goods are not in stock, it is according to quantity. Q: Do you provide samples ? is it free or extra ? A: Yes, we could offer the sample for free charge but do not pay the cost of freight. Q: What is your terms of payment ? A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls send inquiry to us directly.
Related Products

Contact Supplier

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Refrigeration & Heat Exchange Equipment > Cooling Tower
Categories
Hi~