hazelnuts breaking husking machine almond sheller machine for sale
USD $650 - $800 /Set
Min.Order:1 Set
1.The description of the almond sheller machine:
This machine is mainly used for removal of all kinds of nuclear hard shell.
It consists of primary processing hulling roller,vibrating screen,a strip level specifications of almond,hazelnut,zizyhus jujube and other hard shell.
It can adjust the roll gap and then take off another specification,and so on.
ing principle of the hazelnut sheller:
The single-grade apricot core shredder is a simple device for shelling apricot kernels. It has a single-stage shell and adjustable gap.
This unit is a single-stage shell. After the apricot kernel is poured into the shell of the machine, there are some small apricot kernels that have not broken the shell. After screening, the gap of the shell breaker should be adjusted and the shell should be broken once.
3.Features of the almond sheller :
Our factory also provides a three-level apricot core shredder, which can be divided into three grades by shell size.
It is easy to operate and can fully meet the needs of small dried fruit processing;
It occupies a small space and is easy to make up the production line.
4.The parameter of the hazelnut sheller machine:
Model | Power | Capacity | Weight | Size | Voltage |
TZ-400 | 2.2kw | 400kg/h | 220kg | 1800*800*1200mm | 380v |
You can also choose the almond shell separator to get pure almonds.
Click the picture to get more information about this machine.
Our other nuts machine :
https://zztaizy.en.china.cn/
1.almond processing line:
2.cashew processing machine:
3.walnut processing machine:
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.