nut almond walnut shell separator almond separating machine
USD $650 - $750 /Set
Min.Order:1 Set
almond walnut nut separator walnut kernel separating machine
nut almond walnut sorting machine kernel shell separator machine
Taizy automatic walnut almond nut shell cracker separating machine
Taizy Almond Peanut Macadamia Nut Cracker Sheller Shelling Machine Price For Sale
Hot sale Automatic Nut Dehulling Pistachio Sheller Almond Shelling Machine
1.Description of the nut separating machine:
This machine is mainly used for the separation between almonds, apricot kernels, hazelnuts, walnut kernels and other nut shells. It is an auxiliary equipment for nuts shelling machine.
large nut shell kernel separator: It adopts double fan, the separation screen surface is extended and widened, so that the material separation is more uniform and clean, and the separation rate is improved, which is obviously superior to the small single fan separator.
2.Working principle of the almond separating machine:
The machine utilizes the different specific gravity and suspension speed of the nuts and the shells to promote the separation of the almonds from the broken shells by means of a gas flow that passes upward through the gaps of the particles. Because the specific gravity of almond and apricot shells are different, the separation between kernel and shell is good.The general nut separation rate is 90--98%.
3.Parameter of the walnut separating machine:
Model | Capacity(kg/h) | Power(kw) | Voltage(v) | Frequency(HZ) | Size(mm) |
TZ-400 | 400-500 | 2.2 | 380 | 50 | 2300*800*1600 |
TZ-800 | 800-1000 | 3-4 | 380 | 50 | 3500*1000*1800 |
Our other machine :
https://zztaizy.en.china.cn/
Nut sheller and shell separator:
1. Are you manufacturer?
Yes, we are. Welcome to visit our factory.
2. Can you change the machine voltage as our request?
Yes, we can.
3. How about your after-sales service?
Our engineer can go outside to install and train your workers to operate the full machine line.
4. Warranty time of your machine?
1 year except for consumable spare parts.
5. How about delivery time of your machine?
Generally it needs 5-7 days for big machines or producing line,and it will be much longer but within our negotiated delivery time.