Plastic Recycling Equipment / Plastic Granules Machine / Plastic Pelletizing Machine
Negotiable /Set
Min.Order:1 Set
Qingdao Intermedios Plastic Machinery Co.,LTD
Plastics Crusher Plastic Auxiliary Equipment / Plastic Crushing Machine
Wood Powder Making Machine Plastic Auxiliary Equipment 1500mmX1500mmX1500mm
Single Wall Corrugated Electric PVC Pipe Making Machine Single Screw Extrusion
Automatic HDPE Plastic Single Screw Extruder Machine For Water / Gas Pipe
CE & ISO PE Pipe Extrusion Line Plastic Pipe Manufacturing Plant Customized
Single Screw PVC Pipe Extruder Plastic Extruding Machine Pipe Production Line
Plastic Scraps Recycling and Granulating / Pelletizing Machine
The plastic recycling production line has two parts:
one is plastic crushing and cleaning machine,
one is plastic granulating / pelletizing machine.
All the plastic recycling production line is made to order, the buyer provide the information for waste plastics,then we give the machinery design.
Always,we will crush the waste plastics firstly,then clean it,and granulate finally.For some materials,it maybe need a miller for powder,not granule.
Here is a normal pelletizer machine map:
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment ( the date of B/L )