PVC Plastic Pipe Extrusion Braided Fiber Reinforced Hose Making Machine
Negotiable /Set
Min.Order:1 Set
Qingdao Intermedios Plastic Machinery Co.,LTD
PVC Electrical Conduit Pipe Making Machine PVC Pipe Extruder 16mm to 63mm
PVC Fiber Hose / Mesh Pipe / Snakeskin Tube Extruder Machine 12mm-50mm
High Calcium Powder PVC Pipe Extruder PVC Pipes Making Machine
Single Wall Corrugated PVC Pipe Production Line 5mm to 15mm Diameter
Double Wall Corrugated PVC Pipe Extruder For Water Drainage System
Plastics Extruder PVC Pipe Extrusion Machine for High Pressure Gas / Water
Raw material: PVC Granular material and yarn
PVC braided fiber reinforced hose making machine / extrusion line (10mm-50mm) condition:
Warehouse/Workshop |
Dimension (M*M*M): 10m (L)×2m(W) × 2.4m (H) |
Temperature & Humidity |
≤40℃, |
Power supply & Installation |
According to your customer requirment |
Wire/cables: |
Wires/cables from power supply to control cabinet of this production line |
Cooling Water hose/pipe |
Water supply to machines and pools |
Lubrication oil |
Exxon mobile |
Compressor |
Supply compressed air |
The PVC braided fiber reinforced hose making machine / extrusion line(10mm-50mm) video:https://youtu.be/KdgCH7uxd4Q
Configuration of PVC braided fiber reinforced hose making machine / extrusion line / extruder (10mm-50mm):
Installed Power: 68KW , 380V three phases+natural+ground, 60HZ
Load Factor: 50%-80%
Circulation cooling water: 2m3/h
1. Automatic feeding system 1set
2. Single screw extruder: SJ- 50x28 1set
3. Extrusion Dies for inner layer transparent hose 1 set
4. Cooling water tank: 1set
5. Haul off unit 1set
6. Braider 1 set
7. Dryer Oven unit 1set
8. Winder with one coiler 1 set
9. Digital Electrical System 1 set
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)