Wood Powder Making Machine Plastic Auxiliary Equipment 1500mmX1500mmX1500mm
Negotiable /Set
Min.Order:1 Set
Qingdao Intermedios Plastic Machinery Co.,LTD
Single Wall Corrugated Electric PVC Pipe Making Machine Single Screw Extrusion
Automatic HDPE Plastic Single Screw Extruder Machine For Water / Gas Pipe
CE & ISO PE Pipe Extrusion Line Plastic Pipe Manufacturing Plant Customized
Single Screw PVC Pipe Extruder Plastic Extruding Machine Pipe Production Line
Water Supply and GasHDPE Pipe Extruder Plastic Extrusion Machine High Speed
High Speed PPR Pipe Extrusion Machine Plastic Extruding Machine
Plastic and wood Powder Miller Machine
Plastic and WPC / Wood Powder Miller Machine is used to mill plastic or wood into powder after the wood or plastic products being crushed.
Plastic and wood Powder Miller Machine information(SMF-660)
Type | SMF - 660 |
ID of powder room | ¢660 mm |
Speed of mainshaft | 2200 r / min |
Power | 45 kw |
Output | 400 - 600 kg / h |
Dimension | 1500mmX1500mmX1500mm |
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)