380V 3 Phase Plastic Profile Extruder Machinery for PVC Edge Band
Negotiable /Set
Min.Order:1 Set
Qingdao Intermedios Plastic Machinery Co.,LTD
PVC Window Profile Extrusion Machine Plastic Extruding Machine Custom
Roof Tiles Making Machine Plastic Profile Extruder PVC Floor Tile Production
60KW High Power Plastic Extruder Machine For PMMA or Acrylic Bar / Rod 30mm-120mm
Wood and PVC Composite WPC Profile Machine Single Screw Extruders
Plastic Floor Board WPC Profile Machine Wood Plastic Composite Machine
Outdoor Decking Board WPC Profile Machine Wood Plastic Composite Machinery
Plastic profile extruder / extrusion machine for PVC edge band
PVC edge band extruder / extrusion machine is used to produce PVC / WPC edge band.
PVC edge band width : 5mm-300mm
PVC edge band extruder / extrusion machine information:
Materials:PVC powder
1. Power supply: 380V / 3 phase / 50Hz
2. Installed Power : 70kw
3. Output :150kg / h
4. Production application: edge band
PVC edge band extruder / extrusion machine equipment list:
1. 51 / 110 double screw extruder one set
2. Die mould one set
3. Embossing machine one set
4. Cooling tank one set
5. Haul-off machine one set
6. Surface sizing unit one set
7. Winder one set
8. Electrical control unit one set
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)