Two Layer Gas Hdpe Pipe Manufacturing Plant Plastics Extrusion Machinery
Negotiable /Piece
Min.Order:1 Piece
Qingdao Intermedios Plastic Machinery Co.,LTD
Double Wall Corrugated DWC Pipe Machine HDPE Pipe Extrusion 200mm to 500mm
HDPE Pipe Extrusion Machine / Polypropylene Extruder / PVC Extruder Machine
PP Spiral Corrugated Pipe Extrusion Line HDPE Pipe Extruder 200mm-1200mm
Plastic Pipe Manufacturing Machine , Drain / Scupper PVC Pipe Extruder Machine
High Precision PP Extrusion Machine Plastic Extruders 16mm to 63mm
Auto Single Screw Extruder PPR Pipe Extrusion Machine 16mm-110mm
Two layer HDPE Gas Pipe Extruder / Extrusion Line (16mm-63mm)
This Two Layer HDPE gas pipe extrusion machine is mainly used to produce HDPE pipe for water / gas supply, and sewage and drain pipe, also undergroud pipes.
The Two layer PE Gas Pipe Extrusion Line (16mm-63mm) video:https://youtu.be/3WkyB6oXQTM
Two layer PE Gas Pipe Extrusion Line (16mm-63mm) Introduction:
1. Total installed power:150Kw, 380 V three phases+N+G, 50HZ
Load factor: 55%-80% (Actual power is 65kw)
2. Cooling circulars water: 10 m3/h
3. Compress air:0. 8m3/min
4. Workhouse: 50000×2500×2800mm(length, width and high of line)
5. Products dimension: 16mm,20mm,25mm,32mm,40mm,50mm,63mm
6. Raw material :HDPE 80/100
7. HDPE Pipe working Pressure:SDR9 & SDR11
8. Max Output:160 kgs per hour
Two layer HDPE Gas Pipe Extrusion Line (16mm-63mm) Machinery Specification:
All the HDPE pipe extrusion machine / production line:
1. Automatic Feeder and drying hopper
2.Single Screw Extruder SJ50/33
Single Screw Extruder SJ40/33(for out layer PE pipe,thickness is 0.5-1.5mm)
Single Screw Extruder SJ25/25(For the mark line of the PE pipe)
3. HDPE PIPE Extrusion molds (SDR11,SDR17)
4.Vacuum sizing tank
5. spray cooling tank
6.Heating printer with all letter blocks
7. Belt haul-off unit
8. Non scrap Cutting unit:
9. Stack unit
10. Winder
11. Electric Control Cabinet
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)