Auto Single Screw Extruder PPR Pipe Extrusion Machine 16mm-110mm
Negotiable /Set
Min.Order:1 Set
Qingdao Intermedios Plastic Machinery Co.,LTD
Fiberglass Three Layer PPR Pipe Extrusion Machine / PPR Pipe Machine
Glass Tube PPR Pipe Extrusion Machine Plastics Extruder 75mm-160mm
Recyled Polypropylene PPR Pipe Extrusion Machine for Random Water Pipe
Clear PVC Plastic Pipe Production Line Fiber Reinforced Hose Making Machine
PVC Pipe Extruder Machine Plastic Pipe Production Line for Agriculture
Carbon Spiral Reinforced Corrugated PE Plastic Pipe Production Line 50mm-150mm
PPR pipe extrusion machine / production line / extruder(16mm-110mm)
PPR pipe machine / production line is mainly used in the manufacture of the plastic PPR pipes ,with various tube diameters and wall thickness in the aspects ,such as the agricultural and nonstructural plumbing, cable laying etc.
PPR pipe extrusion machine/production line (16mm-110mm) production:
PPR pipe productive process:
The PPR pipe extrusion machine / production line / extruder (16mm-110mm) introduction:
1. Total installed power: 86Kw, 380 V three phases+N+G, 50HZ
Load factor: 55%-80% (Actual power is 65kw)
2. Cooling circulars water: 0.6 m3/h
3. Compress air:0.8/min
4. Workhouse: 36000×3000×3000mm(length, width and high of line)
5. Products dimension: 16mm-110mm
Model | PPR-63 | PPR-110 | PPR-160 |
Extruder | SJ 65 | SJ 90 | SJ 120 |
Pipe type | 16-63mm | 50-110mm | 90-160mm |
Max output | 160kg/h | 200kg/h | 300kg/h |
Air pressure | 0.3 | 0.5 | 0.5 |
Total power | 72kw | 115kw | 150kw |
Weight | 3500kg | 4000kg | 4500kg |
The PPR pipe extrusion machine / production line / extruder (16mm-110mm) machinery specification:
All the PPR pipe production line:
1. Automatic Feeder and drying hopper
2. Single Screw Extruder 65/33
3. Mark line extruder SJ 25/25
4. PIPE molds
5. Vacuum sizing and spray cooling tank
6. Belt haul-off
7. Non scrap Cutting unit
8. Stacker
9. Digital control cabinet
Technology and Service:
1. Seller supply full set of technical document, cutter and other full document (write in English).
2. Seller supply training for buyer’s staff until buyer can produce the eligible production independently.
3. Seller is responsible for installing, testing, adjusting and debugging the machines in buyer’s factory.
4. Buyer should pay the expense for our engineers including for our engineer including round-
way tickets, inland traffic, lodging and boarding fee when the machine is installed, tested and maintained.
5. Seller will go to install machines after the machine is arrived at buyer and buyer will have prepared all
conditions (including power, water, compress air, tools and materials for producing pipe, etc) for installing
and testing these machines. Buyer should pay 60USD/day.
6. When installing,people of both sides cooperate well and carefully,buyer supplies convenient working
condition,any problem, should discuss peacefully and kindly.
7. Buyer supply proper working tools, equipments and other conditions.
8. The expense including the accommodation and materials of the trial-
run the machine for testing and other expenses(electric, water, air and worker) will be on seller’s account,
if the buyer or their representatives do the inspection of the machines before shipment.
9. Guarantee period: 14 months after shipment (the date of B/L)