Customized Fork Lift 24v DC Hydraulic Power Unit With Square / Rhombus Motor Flange

Customized Fork Lift 24v DC Hydraulic Power Unit With Square / Rhombus Motor Flange

Negotiable /Set

Min.Order:1 Set

Supply Ability:
0 Set / Sets per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
JINLE
Place of Origin:
China

Wuxi Jinle Automobile Motor Factory.

Business Type: Trading Company
Main Products: Hydraulic DC Motor ,Micro DC Motor ,AC Hydraulic Power Unit

Product Details

Delivery Time:Approx. 30 days depends on quantity
Certification:CE/ISO 9001:2000

 Customized Fork Lift Power Units Hydraulic Power Unit With DC Motor

Quick Details:

Model Specifications

 

Model

Motor Volt

Motor power

Rated Speed

Displacement

System pressure

Tank Capacity

YBZ5-F1.2B1W2/WUDAN1

12VDC

1.5KW

2500rpm

1.2mL/r

20MPa

6L

YBZ5-F1.6B1W2/WUDAN1

1.6mL/r

YBZ5-F2.7B2A2/WUDBN1

24VDC

2.2KW

2.7mL/r

YBZ5-F2.5B2A2/WUDBN1

2.5mL/r

Remark: 1. Please go to page 38 or consult our sales engineer for the different pump displacement, motor power or tank capacity.
    2. The manual override function is available on request. 

General Description


  Equiped with a high pressure gear pump, a DC motor, a multi-functional manifold, valves and a tank, ect. This power unit features power up gravity down actions. Start the motor to lift the machine and the lowering movement is activated by the solenoid valve with the lowering speed controlled by the pressure compensated flow control valve.The products are widely used in the industry of logistic devices such as fork lift, mini lift table etc.

Outline Dimension

 

Special notes


  1. The duty of this power unit is S3, i.e., 30 seconds on and 270 seconds off.
  2. Clean all the hydraulic parts concerned before mounting the power unit.
  3. Viscosity of the hydraulic oil shoud be 15~68 cst,which should also be clean and free of impurities.N46 hydraulic oil is
   recommended.   
  4. Check the oil level in the tank after the initial operation of the power unit.
  5. Oil changing is required after the initial 100 operation hours, afterwards once every 3000 hours.

Contact Supplier

Ms. Alice sale Manager Chat Now
Telephone
86-510-82722586
Mobile
86-13921515108
Fax
86-510-83314357
Skype
autoqiang1981@hotmai
Address
15#,xinsheng Industrial Zone,luoshe town Huzhou,Zhejiang

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Apparel & Textile Machinery > Textile Machinery > Spinning Machines
Categories
Hi~