Custom Square R6M 2S CCM / Steel Billet Casting Simple Cooling Bank
Negotiable /Set
Min.Order:1 Set
Custom Square R6M 2S CCM / Steel Billet Casting , 1 Adjusting Circuit
Quick Detail:
radius: R6M, R8M, R10M
Strand number :1 / 2 strands
with ISO certification
advanced design
safe operation
Rectangular bloom / square billet
Description:
1. Basic standby technical parameters:
Steel billet casting machine radius |
6m |
Strand quantity |
2 strands |
Ladle support type |
Ladle turret,Ladle car |
Tundish carriage |
Semi-portal, cross sliding function |
Casting method |
Metering nozzle, open casting |
Secondary cooling |
Water cooling , 1 adjusting circuit |
Withdrawal straightening machine |
Totally 5 roller, progressive straightening |
Roll table |
Chain group centralized drive |
Dummy bar |
Rigid, with self-adapting dummy bar head |
Billet cutting |
Hydraulic cutting machine |
Billet conveying |
Group centralized live roller table |
Cooling bank type |
Simple cooling bed |
2. Casting speed, productivity and strand quantity
R6m radius casting machine can cast steel groups of different specifications, the maximum casting speed is as follows:
Casting sectional area(mm) |
100×100 |
125×125 |
150×150 |
Casting speed(m/min) |
2.8 |
2.6 |
2.4 |
NO. |
Billet size |
Casting speed |
hourly output (tons) |
Daily output 20hour (tons) |
Annual output(300days) (tons) |
1 |
100×100 |
2.8m/min |
10.55 |
211 |
63302 |
2 |
125×125 |
2.6m/min |
15.31 |
306 |
918445 |
3 |
150×150 |
2.4m/min |
20.35 |
407 |
122,083 |
The calculation results is the ideal state of the production, please according to own actual situation of adjustment.
Steel grade |
Casting grade(m/min) |
Effective deformation rate(ε) |
Allowable deformation rate(εmax) |
Straight carbon steel |
1.8~2.5 |
Please refer to the computational table |
0.25 |
Low alloy steel |
1.3~2.0 |
Please refer to the computational table |
0.15~0.2 |
3. Technical process description and capacity of steel billet CCM
Induction furnace:
Nominal capacity |
15T |
Tap-to-tap cycle |
60min |
Furnace quantity |
3sets |
Production capacity
Working days |
330 days/year |
Average number of daily furnace |
24/day |
Production capacit |