Delivery Time:15-45days
Certification:ISO /CE
Program-controlled switches cabinet cabinet powder coating line
1. The powder coating line included : pre-treatment, water drying, powder coating And recycling, powder curing, hanging conveyor device five major components.
2. Can handle galvanized, carbon steel and aluminum alloy three Material workpiece;
3. Process: On-line - pre-treatment - hair - moisture drying --- natural cooling --- (shielded or offline) - Powder coating --- powder curing ---Natural cooling --- check
Program-controlled Switches Cabinet Electrostatic Paint Coating Line
(1) Pre-treatment equipment: 10-station fully enclosed channel-type spray Shower structure. Can handle galvanized, carbon steel and aluminum alloy three Material workpiece;
(2) water drying equipment: straight-through single stroke, double air curtain Structural design. Heating medium is natural gas, heating method for indirect heat Heating cycle in the wind;
(3) powder coating and recycling equipment: produced by COLO
(4) powder curing equipment: straight-through two-stroke, double air curtain Structural design. Heating medium is natural gas, the heating method for indirect hot air heating cycle
(5) hanging conveyor equipment: technology used by the U.S. made in China general-purpose suspension conveyor.
Process:
On-line - pre-treatment - hair - moisture drying --- natural cooling --- (shielded or offline) - Powder coating --- powder curing ---Natural cooling --- check