LPG Tank Powder  Coating Line 1 - 4 m/min  adjused speed  with Custom Design

LPG Tank Powder Coating Line 1 - 4 m/min adjused speed with Custom Design

Negotiable /Piece

Min.Order:1 Piece

Supply Ability:
0 Piece / Pieces per Month
Payment Terms:
T/T L/C D/P D/A
Delivery Detail:
7 days

Quick Details View All >

Brand Name:
COLO
Place of Origin:
China

Hangzhou color powder coating Equipment Co., Ltd,

Business Type: Trading Company
Main Products: Powder Coating Line ,Spray Coating Line ,Paint Coating Line

Product Details

Delivery Time:15-45days
Certification:ISO /CE

industrial spray painting equipment

1. The production line consists of pre-treatment equipment, the moisture drying equipment, spray equipment, powder curing equipment, hanging conveyor and electric control system

2. Maximum workpiece size L200×W200×H500 (mm) , Max weight ≤30kg/pcs

3.  Production line speed range 1.0~6.0m/min

 LPG Tank Powder Spray Coating Line System 1 - 6 m/min Custom Design 


The production line consists of pre-treatment equipment, the moisture drying equipment, spray equipment, powder curing equipment, hanging conveyor and electric control system and so on.
Note: sewage treatment equipment, gas equipment, pre-treatment furnace owned by the user;


Design parameters (the demand side):

 
LPG tank powder coating

Item

Name

Design basis

1

Product name

Fire cylinders

2

Product material

Cold-rolled steel

3

The maximum thickness of the material

≤4.0mm

4

Pre-treatment

Full spraying

5

Maximum workpiece size

L200×W200×H500 (mm)

6

hanger

2 / hang (or according to the size of the workpiece)

7

Max weight

≤30kg/pcs

8

Overhead conveyors

Chain the QXT-250 Length: 350 meters,3kw two sets of drive: Tension: R600 hammer 2 sets

9

Output per day

2400hanger/8hour(assembly)

10

Working time

8hour

11

Per minute production layout space

5 hanging / min length 0.5m

12

Process speed

Process speed: 3m/min actual design: 3m/min

13

Production line speed range

1.0~6.0m/min

14

Moisture drying temperature

120~150℃

15

Moisture drying time

8.0~10min

16

Before the heating source

Atmospheric pressure coal-fired water heaters: 1.0T / h

17

The moisture drying tunnel heating source

Curing bake tract waste heat

18

Spray booth

1.2  galvanized sheet two sets 

19

Powder curing drying tunnel heating source

Coal Stove 600,000 Kcal / h

20

Use of the venue

L47m×W12m×H8.5m

Second, the process design:

1, the production line process:
   In order to deal more effectively with steel inner and outer surfaces of the oil and phosphate treatment; pre-treatment process the spray treatment process; multi-channel washing countercurrent connection. This keeps the the workpiece surface clean, but also save water.
     The pre skim 2.0min60 ° C - main skim 3.0min60 of C - washing 1.0min-washin

Contact Supplier

Miss. Sonne sale Manager Chat Now
Telephone
86-571-88194898
Mobile
86-88194898
Fax
86-571-85335616
Skype
hicolosystem
Address
NO.51 fuqiang RD,Gongshu District Shaoxing,Zhejiang

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Packaging & Printing > Packaging Boxes
Categories
Hi~