AWS EM12 welding mig wire roll submerged arc welding wire 2.0mm-5.0mm
USD $500 - $700 /Ton
Min.Order:1 Ton
Tianjin Xuzhi Machinery & Electrical Equipment Co., Ltd.
Welding mig wire roll showroom
1.Specification:
GB H08MnA, AWS EM12
2. Diameter:
φ2.5, φ3.2, φ4.0, φ5.0 (mm)
3.Introduction:
It is a kind of medium-manganese and medium-silicon type welding wire. It matches with medium-manganese and medium-silicon type welding flux. It is not sensitive to the rust on the base metal. It has excellent bead molding and slag detachability. Monopole or dipole. AC/DC.
4.Uses:
Used together with fused flux 350 or sintered flux 101. Used for both high speed welding and filling welding on 50kg class base metals.
5.Chemical Composition of Welding Wire(%)
P | Ni | Cr |
≤0.030 | ≤0.30 | ≤0.20 |
6.Examples of Chemical Composition of Deposited Metal (%)
C | Mn | Si | S |
≤0.10 | 0.8~1.1 | ≤0.07 | ≤0.030 |
7.Mechanical Properties of Deposited Metal
Test Items | Rm | ReL or Rp0.2 | A | KV2(J) | |
Flux Used Together | (MPa) | (MPa) | (%) | 0℃ | -20℃ |
SJ301 | 415-550 | ≥330 | ≥22 | ≥80 | ≥34 |
HJ431 | 415-550 | ≥330 | ≥22 | ≥27 | — |
8. Welding type
9.Advantages
Welding mig wire roll packing details
20kg plastic spool packing
25kg, 50kg, 150kg, 250kg, 350kg transverse wind without core.
30kg, 50kg bundle
250kg wind drum packing
Samples:
Supply you one spool 3-5kg wire free of charge to test the quality , Postage will be on the customer’s charge. But postage could be deducted from the first order.
Inspection:
Full-Inspection before delivery. Third party inspection: BV SGS CCIC COC CIQ all accepted .
Information Needed to Get a Quotation:
Model, Diameter, Packing and Quantity, such as Welding Wire EM12 4.0 mm 25kgs one coil, 21.6 tons
How to place order?
Welding mig wire roll manufacturing
Welding mig wire roll warehouse
Q: How does your factory do regarding quality control?
A: We have strict control in testing of raw material, production process and final process. Only qualified products can be sent out.And we have passed ISO,CE,NK,BV,GL,LR,ABS,TUV,DB certificates.
Q: How many days it will take you to produce mass production for us?
A: Usually it takes about 7 to 15 days, it also depends on the quantity and production seasons.
Q: Where is your factory located? Can I visit there?
A: Our factory is located in Tianjin City, China, near to Beijing. You are warmly welcomed to visit us!
Q: Are samples available?
A: We are happy to provide free samples to you after you accept our quotation and really want to cooperate with us.
Q:Is OEM available?
A: Yes, because we usually do it like that.
Your favorable inquiry shall be highly appriciated, my friend!