Rock ore gold mining plant with flotation separating process
USD $30,000 - $100,000 /Set
Min.Order:1 Set
Henan Lanji Machinery Manufacturing Co., Ltd.
Rock ore gold mining plant with flotation separating process :
1. Project engineering design
The project engineering design includes the whole beneficiation flowsheet from the beginning of raw ore plie in the plant to the tailing transportation, general layout drawing, transportation in the plant, electricity power, automation, water supply and drainage, civil construction, foundation, technical economy and so on. The design drawings and documents will be sent to the buyers after the design was finished. This design only includes the gravity separation plant inside. The roads out of plant, the pipeline from the water source area to the plant, outside power system to transformer in the plant are not included.
2. Equipment manufacture and supply
We can supply the whole line of gold leaching plant, including:
A. Crushing system
B. Grinding and classification system,flotation process
C. Leaching system
D. Desorption and electrowinning device
E. Gold smelting system
Seller confirms the requested mechanical equipments in the whole plant during the project engineering design. After offer the detailed equipments list to the buyer for the confirmation, the seller produces the main equipments and purchases the auxiliary equipments.
3. Installation
(1)Manufacturing and installation of process metal structures of the plant:
Including steel hopper, steel chute, steel platforms for operation and steel support; Excluding civil engineering, steel structure platform and steel structure work of the workshop.
(2)Manufacturing and installation of process pipelines of the plant:
Mainly including pipelines of slurry, water, gas and reagent, valves, elbows, flanges and fasteners; Water pipelines excluding parts from water source to the plant, tailings pipelines excluding parts from exit of tailings pipe to tailings dam.
(3)Manufacturing and Installation of distribution boards and operation control cabinets, laying of electric wire and cable, lighting fixtures.
If distance between switch house and plant is more than 3m, will be charged in addition. Excluding switch house, including but not limited to transformer, inlet wire, high-low voltage distribution boards in switch house.
4. Commissioning
The seller will be in charge of guiding the whole beneficiation plant line machinery without loading and the load test running for achieving the perfect status to meet the design targets and output.
The buyer will undertake the water, electric, steel balls, ore, lubrication oil and grease, cleaning instruments and so on needed during commissioning.
5. Personnel training
Seller trains the buyer's managers, technicians and operators to operate the equipments and automation system and control the processing independently, and to manage the plant, maintain the equipments and accept the training of safety knowledge; Confirm the contents of the item descriptions one by one in accordance with the contract requirements of the project, transfer all the technical documents and deliver the plant to the buyer.
6. Other notes
The foundation, workshop, civil construction and tailing pond will be done by the local company entrusted by the buyer according to the drawing& design provided by the seller.
Contact: Ms Sara
Mobile phone : 008613783471727
Skype: sarapang6