Gold ore flotation separation plant with cyanide leaching process
Gold ore flotation separation plant with cyanide leaching process
Gold ore flotation separation plant with cyanide leaching process

Gold ore flotation separation plant with cyanide leaching process

USD $70,000 - $160,000 /Set

Min.Order:1 Set

Supply Ability:
100 Set / Sets per Month
Port:
QingDao TianJin ShangHai
Payment Terms:
T/T L/C D/P D/A Credit Card

Quick Details View All >

Condition:
New
Type:
Flotation Separator
Production Capacity:
500-1000T/D
Place of Origin:
Henan, China
Brand Name:
LanJi
Model Number:
50-1000T/D

Henan Lanji Machinery Manufacturing Co., Ltd.

Business Type: Manufacturer,Trading Company
Zhengzhou Henan China
Main Products: mining equipment ,beneficiation plant ,cement plant ,crusher ,ball mill

Product Details

Gold ore flotation separation plant with cyanide leaching process:

Gold Mining Equipment- Gold CIL (carbon in leaching)Plant line mainly include following equipment:

 

Vibrating Feeder

 

Jaw crusher, cone crusher

 

Vibrating screen

 

Belt conveyors

 

Ball mill

 

Spiral classifer

 

Hydrocyclone

 

Thickener

 

Leaching Tanks

 

Electrowinning and desorption device

 

Gold smelting furnace

CIL plant consists of following steps:

 

1 The ore is first reduced in size (typically 80% passing 200mesh ) to ensure that all nonrefractory gold is readily accessible for cyanide leaching, There are several variations of comminution circuits used in the gold

industry, such as: Multi-stage crushing, then ball milling circuits, typical of ball mill and hyrocyclones.

 

2 Thickening(add lime flocculant)

After comminution the pump is normally dilute and thickening. High efficient thickener is performed to increase the pulp density to about 50% solids by mass. 

 

3 Leaching

Leaching reagents in the form of cyanide and and oxidant such as air or oxygen are added after thickening. Leaching take place in a series of agitated leaching reactors.

 

4 Carbon adsorption

After leaching, the pulp is passed over a feed screen to ensure removal of tramp materials about 0.6mm. This is done to minimize screen blocking in the adsorption section. After feed pre-screening, the pulp flows trough a cascade of well mixed adsorption tanks, typically 6-8 in number. The pulp residence time is about one hour in each tank. The tanks are normally mechanically agitated and each will contain a batch of carbon of concentration 10-25grams of carbon per litr of pulp. The carbon size is 0.6-0.8mm. The gold recovery is 90-99%.

 

5 Desorption and electro-winning

The loaded carbon is processed by desorption and electro-winning set, by this solution, it gets grain gold.

 

6 Gold melting

 

If you are in the market for gold cyanide leaching production line, welcome to contact us, we can provide you complete set machine and one step services.

Gold ore flotation separation plant with cyanide leaching processGold ore flotation separation plant with cyanide leaching process

 

 

Contact Supplier

Mr. Victor Cheng Manager Chat Now
Telephone
0086-371-67833678
Mobile
15136101688
Fax
0086-371-67790366
Address
West 4th ring road and hua gong road crossroads. 50m westward. High-Tech Development Zone ,Zhengzhou, China Zhengzhou,Henan

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Machinery > Energy & Mineral Equipment > Mining Machinery > Mineral Separator
Categories
Hi~