LIQUID 3D FLOORS METALLIC EPOXY FLOOR
LIQUID 3D FLOORS METALLIC EPOXY FLOOR
LIQUID 3D FLOORS METALLIC EPOXY FLOOR
LIQUID 3D FLOORS METALLIC EPOXY FLOOR

LIQUID 3D FLOORS METALLIC EPOXY FLOOR

USD $17.2 - $22.45 /Set

Min.Order:360 Sets

Supply Ability:
20 Ton / Tons per Month
Port:
Taichung Port Taiwan

Quick Details View All >

CAS No.:
38891-59-7
Other Names:
Epoxy Floor Paint
MF:
Mixture
EINECS No.:
F-E
Place of Origin:
Taiwan
Main Raw Material:
Epoxy

BUO GUH PAINTS CO., LTD.

Business Type: Manufacturer,Trading Company
Main Products: Polyurethane Paint ,Epoxy Paint ,Fluorocarbon Paint ,Hammer Tone Paint ,Rwady-Mixed Paint

Product Details

 

LIQUID 3D FLOORS METALLIC EPOXY FLOOR

 

 

Product Description

 

 

TOP COAT EPOXY RESIN PAINT

TYPE

A two-pack, multipurpose epoxy finish coating based on Epoxy Resin.

USES

Topcoat for cement products, bridge, steel pipes, steel structure of factories.

CHARACTERISTICS

1. Tough, hard film and high abrasion resistance.

2. Excellent resistance to sea water.

3. Excellent resistance to mechanical damage.

4. Very good resistance to oil and mild chemicals

APPLICATION METHOD

Spray, Brush, Roller.

COLOR

Desired colors

FINISH

Gloss

SPECIFIC GRAVITY

Above 1.1 kg/L, depending on colors (Mixture)

VISCOSITY (25)

70 ~85 KU (Mixture)

DRYING TIME (25)

Set-to-touch

Dry hard

Fully cured

3 hrs.

24 hrs.

7 days.

OVERCOATINGINTERVALS (25)

Min.

Max.

8 hrs.

5 days. (25) or 3 days. (30)

OPTIMUM FILM THICKNESS

Wet

Dry

100 microns

40 microns

VOLUME SOLIDS

Above 60%(Mixture)

THEORETICAL COVERAGE

10m2/L    9 m2/KG    38m2/GL

THINNER

Epoxy Thinner

THINNING RATE

5 ~10 %(by wt.)

PRECEDING COATS

Epoxy Primer

STORAGE SHELF LIFE

Minimum 1 year under normal storage conditions.

MIXING RATIO

Base : Hardener = 5 : 1 (by wt.)

POT LIFE

8 hrs. (Mixture) (25)

NOTE

1. Mix base and hardener according to the mixing ratio and stir thoroughly.

2. Remove any soap, dust, rust, grease, old paint surface or any salt-containing

    chemicals before coating.

3. Avoid applying the paint in rainy weather or humidity above 85% RH,

    particularly, a wet surface must be thoroughly dried

4. All equipment must be cleaned immediately after use.

5. When used inside tanks, sufficient ventilation must be provided.

6. When overcoating interval is exceeded, paint surface must be roughened to

    insure adhesion.

7. Coating surface would be chalking by sunshine.

 

 

Technology

 

 

 

 

 

Certifications

 

LIQUID 3D FLOORS METALLIC EPOXY FLOOR

 

 

Color

 

LIQUID 3D FLOORS METALLIC EPOXY FLOORLIQUID 3D FLOORS METALLIC EPOXY FLOOR

 LIQUID 3D FLOORS METALLIC EPOXY FLOOR

 

Finished Products

 

 LIQUID 3D FLOORS METALLIC EPOXY FLOOR

 

Company Information

 

 LIQUID 3D FLOORS METALLIC EPOXY FLOOR

 

 

 

 

Contact Supplier

Mr. John Tsai sales Chat Now
Telephone
886-4-24065996
Mobile
0910505048
Fax
886-4-24070510
Address
No. 637, Sec. 3

You May Like

New Products

Recommended Products

View More View Less

Find Similar Products By Category

Chemicals > Coating&Paint
Categories
Hi~