high quality good design plastic cap mould
USD $3,000 - $10,000 /Set
Min.Order:1 Set
Taizhou Huangyan Magic Mould Co., Ltd.
2014 HOT SALE plastic cap mould for sprayer mold manufacture Taizhou China
2014 HOT SALE Plastic Cap Mould (sprayer cap mould) Huangyan Taizhou China
2014 HOT SALE super quality Plastic Cap Mould (Plastic sprayer cap mould)
Plastic Bottle Caps/Plastic Soda Bottle Cap/Plastic Bottle Cap for Plastic Injection Mould
2015 super quality soda Bottle Cap Mould, Plastic soda Cap Mold, China Supplier
Plastic cap mould
1.Mould material:P20H
2 Mould Base:45#
3.Runner :cold runner
4.Design:UG,PROE,CAD ect
5.save cost
6.Life time:500.000shots
7.Customize is welcome
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
plastic cap mould
Following information is essential for your better understanding on our moulds
Name | Description |
Mould Material | P20H |
Mould Base | 45# |
Cavity | single |
Runner | cold runner runner |
Mould Design | 3D/2D Drawing |
Design Days | 3 days |
Design Software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic Material | PS |
Mould Life | 300,000 shots |
Injection System | eject pin |
Polish System | Mirror Polish |
Payment | 50% of Deposit by T/T,50% of Balance by T/T |
Delivery Time | 50-60days |
Specification | Depends on customers requirements |
Business Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
2.Quotation Making | Mould Quotation will be finished in 1day according to information we get |
↓↓↓ | |
3.Negotiation | The quality ,price ,material,delivery time .payment item.ect |
↓↓↓ | |
4.Mould Design | 3-5days for mould and product 3D/2D drawing design |
↓↓↓ | |
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 40-50days |
↓↓↓ | |
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
7.Sampleshoot | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory |
↓↓↓ | |
8.Delivery | Delivery goods by sea or by air ,according customers requirement |