China factory supply Plastic CSD bottle cap mould,Soft drink bottle cap mould , Minerial water bottle cap mould
USD $500 - $5,000 /Set
Min.Order:1 Set
Taizhou Huangyan Magic Mould Co., Ltd.
2015 new design soft drink bottle cap mould factory maker CHINA TAIZHOU HUANGYAN
super quality silicone bottle cap mould ,silicone bottle cap mould ,wine cap mould maker
2015 new design super quality water proof leaking soda bottle cap with inner mould maker
2015 new design custom EU standard mould of 5 gallon injection bottle cap manufacturer
2015 new design high quality plastic injected bottle cap mould 5 gallon bottle cap
Beautiful High quality 28mm plastic water bottle sport caps mould CHINA TAIZHOU HUANGYAN
soda bottle cap mould
1.Mould material:P20H
2.Mould Base:45#
3.Runner :cold runner
4.Design software:UG,PROE,CAD ect
5.save cost6.Life time:500.000shots
7.Customize is welcome
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
Name | Description |
Mould Material | P20H |
Mould Base | 45# |
Cavity | single |
Runner | cold runner runner |
Mould Design | 3D/2D Drawing |
Design Days | 3 days |
Design Software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic Material | PS |
Mould Life | 200,000 shots |
Injection System | eject pin |
Polish System | Mirror Polish |
Payment | 50% of Deposit by T/T,50% of Balance by T/T |
Delivery Time | 10days |
Specification | Depends on customers requirements |
Business Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
2.Quotation Making | Mould Quotation will be finished in 1day according to information we get |
↓↓↓ | |
3.Negotiation | The quality ,price ,material,delivery time .payment item.ect |
↓↓↓ | |
4.Mould Design | 3-5days for mould and product 3D/2D drawing design |
↓↓↓ | |
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 40-50days |
↓↓↓ | |
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
7.Sampleshoot | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory |
↓↓↓ | |
8.Delivery | Delivery goods by sea or by air ,according customers requirement |