Beautiful High quality 28mm plastic water bottle sport caps mould CHINA TAIZHOU HUANGYAN
USD $500 - $5,000 /Set
Min.Order:1 Set
Taizhou Huangyan Magic Mould Co., Ltd.
Professional Injection Plastic Sports Bottle Cap Mould/new design sport bottle cap mold
2015 High quality mold plastic bottle cap mould/ new design sports cap molding
2015 hot sale-Sport bottle/water bottle mould/super quality sport cap mould
Sports water lid mold, Sports water cap mold, huangyan mold factory, plastic bottle cap mould
custom made chewing gum bottle tear off cap mold/Chewing gum anti-theft cap moulds
OEM Chewing gum anti-theft cap moulds/super quality Chewing gum anti-theft cap moulds
plastic water bottle sport caps mould
1.Mould material:P20H
2.Mould Base:45#
3.Runner :cold runner
4.Design software:UG,PROE,CAD ect
5.save cost6.Life time:500.000shots
7.Customize is welcome
As a professional plastic mould manufacturer in China, we are specialized in opening new molds for various of plastic products. Our mould quotation will be made in 1 day and sent to consumers for reference. Quantity of mould and delivery time will be guaranteed.
Following information is essential for your better understanding on our moulds
Name | Description |
Mould Material | P20H |
Mould Base | 45# |
Cavity | single |
Runner | cold runner runner |
Mould Design | 3D/2D Drawing |
Design Days | 3 days |
Design Software | UG,PROE,CAD,CAE,CAM,CAXA ect |
Plastic Material | PS |
Mould Life | 200,000 shots |
Injection System | eject pin |
Polish System | Mirror Polish |
Payment | 50% of Deposit by T/T,50% of Balance by T/T |
Delivery Time | 10days |
Specification | Depends on customers requirements |
Business Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed |
↓↓↓ | |
2.Quotation Making | Mould Quotation will be finished in 1day according to information we get |
↓↓↓ | |
3.Negotiation | The quality ,price ,material,delivery time .payment item.ect |
↓↓↓ | |
4.Mould Design | 3-5days for mould and product 3D/2D drawing design |
↓↓↓ | |
5.Mould | According to customers' request to build the mould.Before make the mould .we send mould design to customer approval first . Mould will be usually finished in 40-50days |
↓↓↓ | |
6.Mould Testing | When moulds are finished,we will test the moulds to check it satified consumers' needs.And we will send samples for consumers' reference. |
↓↓↓ | |
7.Sampleshoot | If the first sample come out is not satisfied customer .we modify the mould and until meet customers satisfactory |
↓↓↓ | |
8.Delivery | Delivery goods by sea or by air ,according customers requirement |