plastic tube mould
Negotiable /Set
Min.Order:1 Set
Taizhou Huangyan R&D Plastic Mould Co., Ltd.
duct and mould structure design in 2D and 3D program. If necessary R&D offers service offers service for innovative product design with support of mould flow program.
2.Mould project sent for customer confirmation and print 2D tooling and machining artwork detail drawing with acceptable tolerance marked.
3.Purchasing the material and mould standard components according to the list information in 2D tooling detail drawing.
4.Steel material tooling and heat treatment according to the listed step on the 2D artwork detail drawing.
5.Mould assembling and quality inspection according to 2D mould assembling detail drawing.
6.Mould test and products are sent to customer for confirmed.
7.Sample sent for customer inspection and get approval for shipment of mould.
Name | Tee |
Product material | PPR |
Size | 20-315mm |
Connection | Welding |
Shap | Rounded |
Delivery time | 15-60 days |
Packing | paper skin |
The process of making mould
Search | Buyer search the internet to find the seller and the seller try to find the buyer |
|
|
Negotiation | Quality-Price-Mould material-Delivery time-Payment-Technique requests |
|
|
Down payment | Usually 30% before we start working |
|
|
R and D | We offer customers the drawings for products and mould structure |
|
|
Confirmation | We send the drawings to customer to confirm |
|
|
Machining center | CNC milling machine-NC wire cutting-NC-EDM and so on |
|
|
Testing | Testing the mould to make sure everything is ok |
|
|
Confirmation | We send the sample to customer to check |
|
|
Balance | Buyer send us the balance of the mould before shipping |
|
|
Delivery | We send the mould to our customer by sea or by air as the demand of customer |