plastic pvc tube mold
Negotiable /Set
Min.Order:1 Set
Taizhou Huangyan R&D Plastic Mould Co., Ltd.
duct and mould structure design in 2D and 3D program. If necessary R&D offers service offers service for
innovative product design with support of mould flow program.
2.Mould project sent for customer confirmation and print 2D tooling and machining artwork detail drawing with acceptable tolerance marked.
3.Purchasing the material and mould standard components according to the list information in 2D tooling detail drawing.
4.Steel material tooling and heat treatment according to the listed step on the 2D artwork detail drawing.
5.Mould assembling and quality inspection according to 2D mould assembling detail drawing.
6.Mould test and products are sent to customer for confirmed.
7.Sample sent for customer inspection and get approval for shipment of mould.
Every procedure,every segment from designing,manufacturing,inspection to management,we are keeping on the high and stable quality.
We can tailor various kinds of plastic pipe mould each customer as per their requirements.
Following is the essential informations, for your reference.
Name | Description |
Mould material | 3Cr13, S136, P20 etc. |
Mould base | LKM, HASCO ect. |
Cavity | Single/multi |
Runner | Hot/cold |
Design software | UG, PROE, CAD, CAXA ect. |
Plastic material | PP, PC, PS, PE, PU, PVC, ABS, PMMA ect. |
Mould life | 300,000-3,000,000 shots |
Delivery time | 15-60days |
Specification | Depends on customer's requirments. |
Step
1.R&D | We support customer R&D. Make the files or improve the design if you needed. |
↓ | |
2.Negotiation | the quality, price, material, delivery time, payment item, ect. |
↓ | |
3.Place an order | according your own design or you chooses our design. |
↓ | |
4. Mould | According customers request to build the mould. Before make the mould, we send mould design to customer approval first, before move forward to production; we send samples to customer to confirm first. |
↓ | |
5. Sample shoot | If the first sample come out is not satisfied customer, we modify the mould and until meet customers satisfactory. |
↓ | |
6.Products in store | If your quantity is beyond our storage, we will provide lead time to you. |
↓ | |
7. Delivery time | Delivery goods by sea or by air, according customers requirement. |