Air cooler
Negotiable /Unit
Min.Order:5 Units
Excelair M&E Industrial Co., Ltd.
# Specification & Model
Model | EX767 | EX767A |
Airflow | 16000 m3/h | 15200m3/h |
Cover Area | 100~130m2 | 100~130 m2 |
Max. Air pressure | 120 pa | 120 pa |
Designed Air Speed | 10 m/s | 9.4 m/s |
Evap. Efficiency | ~ 92% | ~ 92% |
Water Capacity | 15 Liters | 15 Liters |
Power Supply | 220V, 50Hz | 220V, 50Hz |
Power Consumption | 0.3 ~ 1.2 kW | 0.3 ~ 1.2 kW |
Airflow Adjust | 6 segments | 6 segments |
Programmed on /Off | 6 stages | 6 stages |
Filter Washing | Auto/Manual | Auto/Manual |
UV Water Sterillizing System | Auto | Auto |
Auto Drain | Auto Drain | Auto Drain |
Size of Dropper Duct | 668x668 mm | 668x668 mm |
Make-up Water Inlet | 1/2" | 1/2" |
Installed Dimension | 1040x1040x1105 mm | 1040x1040x1105 mm |
Shipping Dimension | 1040x1040x1230 mm | 1040x1040x1230 mm |
Operation Weight | 95 kg | 89 kg |
Shipping Weight | 88 kg | 81 kg |
20-feet container | 18 units | 18 units |
40-feet container | 38 units | 38 units |
Evaporative cooler cool the outside air temperature withthe directly evaporative cooling, supply the cool and fresh air intothe workshop, and then exhaust the hot air outside. The temperature ofthe workshop will be cooled down by exchanging the air inside.
Space Cooling prerequisite
1) Locations of workers are not fixed
2) Focus on all-round heat reduced environment
3) Space Pressurization is desired to prevent dust entry
4) Heat source is confined or controlled
5) Workspace volume is small
Local Cooling prerequisite:
1) Area of workspace is large
2) Location of workers or equipments are fixed
3) Operation area is entirely different from other area
4)I t is no need to cooling besides the operation area
5) Workspace volume is small
Spot Cooling prerequisite
1) Location of workers are generally fixed
2) Workspace volume is large
3) Heat source is distributed all over
4) Minimum capital layout
5) Focus on maximum comfort for workers
Excelair specially focus on the industrial cooling system and commit ourselves to create better working environment and increase productivity. We have a strict crtierion and monitor during the process of survey on site, system design,construction guide,test operating and after-sales service in order to ensure the efficiency of the whole system.
Over 20 years design and manufacturing experience in the industrial cooling systems. Have made a lot of solutions for many famous enterprises. Insist on quality first for more than two decades, which made us the leader in factory systems industry in China.
Certificate