50KW High Speed Electric Steam Generator Output:65kgs/hour Vertical Steam boiler
USD $8,000 - $10,000 /Set
Min.Order:1 Set
Ningbo GMF Environmental Protection Equipment Technology Co., Ltd.
150kW Thermal oil boiler Electric Thermal oil Boiler Electric oil temperature steam generator
On Sale Steam boiler 200kg/hr Electric Steam boiler 200kg/hr 0.7Mpa Steam boiler 200kg/hr
2016 New Steam boiler for hotel Electric Steam boiler for hotel 0.7Mpa Steam boiler for hotel
380V Cheap steam boiler 65kgs Cheap steam boiler 500 centigrade Cheap steam boiler
Steam boiler for hotel 70kW Steam boiler for hotel Electric Steam boiler for hotel
Laboratory Steam Boiler Electric Laboratory Steam Boiler High Pressure Laboratory Steam Boiler
Model | DCZF-F50-0.7 | DCZF-F70-0.7 |
Rated Capacity | 46KGS/H | 65KGS/H |
Rated Working Pressure | 0.7Mpa | 0.7Mpa |
Input Power | 36kW | 50kW |
Rated Voltage | 380V | 380V |
Main Steam Valve Bore | DN20 | DN20 |
Safety Valve Bore | DN20 | DN20 |
Inlet Valve Bore | DN15 | DN15 |
Drain Valve Bore | DN20 | DN20 |
Pump Power | 750W | 750W |
Weight | 185KGS | 185KGS |
Outer Dimension | 1108*650*1530MM | 1108*650*1530MM |
Rated Steam Temperature | 165℃ | 165℃ |
Q1.What's your company's main product?
A.Our company is specialized in Environmental friendly Electric Steam Generator, thermal oil boiler and E-TPU foaming material.
Q2.What is your qualification?
A.All our products are with CE approved.
Q3.Where is GMF? Is it possible to visit your factory?
A.GMF is located in Cixi city, Zhejiang Province,which is very closed to Ningbo and Shanghai. Warmly welcome the clients all over the world to visit us.
Q4.What is your warranty period? Do you supply spare parts?
A.The warranty period is ONE YEAR; the spare parts will be offered once you place the order with us.
Q5.Do you provide after sale service?
A.Yes.we have a professional after-sale service team to promptly and thoroughly solve your problems.
Q6.What is your payment terms?
A.Machine:30% paid as deposit after contract signed, 65% to be made before shipment, the rest balance to be made after machine installation and commissioning.
Q7.What is your delivery time?
A. 15-30 days after receipt of downpayment.
Q8.Transporation
A.a)Port of loading:Mainly ship from Shanghai/Ningbo China.
b)Shipping service:by sea
Any more information you need, pls feel free to contact us, we will be happy to be assist of you.