Metal Can Seamer Machinery,Tin Can Sealing Machine,Seaming Machine
USD $4,400 - $4,400 /Set
Min.Order:1 Set
Jiujiang Gaoxin Metals Packing Mechanism Co., Ltd.
Hot Sale Tin Can Sealing Machine Manual Seaming Machine from China
Used Condition and Metal Packaging Material FILTER SEAMER Sealing Machine
Tin Can Seaming Machine Semi-automatic Four Wheel Sealing Machine
Tin Can Making Machine Capacitor Sealing Machine Tin Can Seamer
Oil Bucket Semi-automatic Sealing Machine Tin Can Seamer Machinery
Metal Can Seamer Machinery,Tin Can Sealing Machine,Seaming Machine
Model: GT4A7Y Four-wheel Sealing Machine
Technical Parameter
Productivity | 30-35 round cans/min |
Applied Can's Drive and Diagonal | 28-170mm |
Motor Power | 1.1KW |
Weight | 550KG |
Size | 785*650*2000mm |
Usage:
MORE OTHER SEALING MACHINES:
1.Model:GT4A6 Sealing Machine
Technical Parameter:
Productivity | 26-30 round cans/min, 15-20 special-shaped cans/min |
Applied Can's Drive and Diagonal | 28-170mm |
Motor Power | 1.5KW |
Weight | 550KG |
Size | 785*650*2000mm |
Usage:
Productivity | 25-30 cans/min |
Applied can's drive | 30-160mm |
Applied can's height | 32-300mm |
Motor Power | 0.37KW |
Size | 790*600*1360mm |
Weight | 200KG |
Usage:
Productivity | 10-15cans/min |
Applied can's diameter and diagonal | 40-350mm |
Motoe Power | 1.1KW |
Size | 800*650*2000mm |
Weight | 400kg |
Jiujiang Gaoxin company is one of the largest-scale machinery manufacturing companies in China which specializes in capacitors (the shell and cover), filter sealing, cap ( aluminum cap, three and four lug caps, crown cap, pop-top cap), sealing, automatic feeding &NC (numerical control) punch etc. equipments.
1. Warranty: One year after shipment.
2. Delivery Time: 15-30 working days after receiving the advance payment.
3.Power:3 phase 4 wire, 380V, 50Hz(or according to your requirements)
4. Installation and commissioning
Before installation,we will provide machine layout drawing with dimensions, total power, single power, power interface, water &air input and output position, total water consumption. After the machines arrived and have taken seat,you must connect the water and electric and gas into the machines, then we shall send 2-3 technicians to install the production line.