Professional Design ! Shoe Polish Can Making Machine
USD $10,000 - $20,000 /Set
Min.Order:1 Set
Jiujiang Gaoxin Metals Packing Mechanism Co., Ltd.
Metal can production line for shoe polish can making.
About our factory,
Our company is a leading manufacturer in China,specialising in metal packing machinery,able to supply to the clients the complete production lines for various caps,cans,some machines of the lines with function to request,and other mechanical equipments. Any query will be welcome and we will try our efforts to serve you well for good expansion.
Technical parameters of the main machines for shoe can making production line,
1.Production capacity of the line,70-90 cans / min,
2.Parameters of the main machines,
NCP-008 NC punch(25 T),
Production capacity: 60-120 pcs /min,
Applicable max size of metal plates,950*950 meter
Motor power, 6KW (equipped with 25T punch)
Dimensions, 2700*2500*2200mm (equipped with 25T punch, 1*1 meter feeding cradle)
Weight,2600kg(equipped with 25T punch)
NC punch is operated by manual laying as the first step, then NC feeding,punch forming, controlled by PLC.
25T punch,mainly applied for making of fly key opener and bottom cover.
Production capacity, 30 -60 cans/ min
Production pressure, 25 tons
Motor power: 3kw
Dimensions, 1500×1000×2000mm
Weight: 2500kg
Viewing of our factory, warehouse, workshop,
Motors to be assembled to the machines,
Motors,standard as 3phase 4 pol 380V 50HZ,or to the buyer's requirements,which should be specified beforehand for checking and confirming.
When details of the order are confirmed and on receiving 30% T/T in advance as deposit,the machines or complete production line will be put into production. When goods are finished,the machines or the complete production line will be tested in our factory. The buyers will be informed of the readiness for the machines,who will be kindly required to dispatch their technicians or trust the third party to our factory to check or inspect the machines. When machines or complete production line are testified to be qualified ,the balance,70% of the total amount should be paid. All the machines will be dismentled from the production line,repainted,and packed for loading and shipment.
Should the customers have no special requirements,the machines will be packed in wooden cases as we have ever done for shipment,otherwise,the package will follow up the required instructions.
One year after shipment, on proper operation conditions; During the time of warranty, if some components or spare parts get damaged, due to quality problems, the free new ones will be delivered to the buyers for replacement; otherwise, if it is the improper operation that leads to breakage or damage, the new components or spare parts will be provided by us, but they are charged; Beyond the time of warranty, all components for replacement will be charged.