Hot Sale Tin Can Sealing Machine Manual Seaming Machine from China
USD $1,000 - $1,500 /Set
Min.Order:1 Set
Jiujiang Gaoxin Metals Packing Mechanism Co., Ltd.
Hot Sale Tin Can Sealing Machine Manual Seaming Machine from China
Technical Parameter:
Product Name:4A13 Manual Sealing Machine
Productivity: 25-30cans/ min
Applied can's drive:30-160mm
Applied can’s height: 32~300mm
Motor power: 0.37kw
Size: 790×600×1360mm
Weight: 200kg
Usage:
Samples
Other Sealing Machine
1.Model:GT4A6 Sealing Machine
Technical Parameter:
Productivity | 26-30 round cans/min, 15-20 special-shaped cans/min |
Applied Can's Drive and Diagonal | 28-170mm |
Motor Power | 1.5KW |
Weight | 550KG |
Size | 785*650*2000mm |
Usage:
Productivity | 10-15cans/min |
Applied can's diameter and diagonal | 40-350mm |
Motoe Power | 1.1KW |
Size | 800*650*2000mm |
Weight | 400kg |
Productivity | 12cans/min |
Applied can's drive | ≤330mm |
Applied can's height | ≤480mm |
Iron sheet thickness | 0.3-1.8mm |
Motor power | 4KW 380V 50HZ |
Size | 940*640*2150mm |
Weight | 900kg |
Usage:
The machine is also known as filter sealing machine,used for sealing 0.3mm-1.8mm shell.
It can also be used for sealing of thick sheet or largere diameter circular capacitors.
Jiujiang Gaoxin company is one of the largest-scale machinery manufacturing companies in China which specializes in capacitors (the shell and cover), filter sealing, cap ( aluminum cap, three and four lug caps, crown cap, pop-top cap), sealing, automatic feeding &NC (numerical control) punch etc. equipments.
Any questions,please feel free to contact with us.
1. Warranty: One year after shipment.
2. Delivery Time: 15-30 working days after receiving the advance payment.
3.Power:3 phase 4 wire, 380V, 50Hz(or according to your requirements)
4. Installation and commissioning
Before installation,we will provide machine layout drawing with dimensions, total power, single power, power interface, water &air input and output position, total water consumption. After the machines arrived and have taken seat,you must connect the water and electric and gas into the machines, then we shall send 2-3 technicians to install the production line.